Working as a foreman: what you need to know. Job responsibilities of a foreman. Instructions for the construction site foreman. Let’s correctly decipher the job title to understand the full range of responsibilities

1.1. The foreman belongs to the category of managers.

1.2. The following person is accepted for the position of foreman:

1) having a higher education (bachelor’s degree), higher education (non-core) - bachelor’s degree and additional professional education (professional retraining programs in the field of activity), secondary vocational education in training programs for mid-level specialists;

2) completed advanced training in the field of professional activity in the field of construction at least once every five years;

3) having work experience in the field of professional activity:

At least three years in the profile of professional activity in the field of construction with secondary vocational education - training programs for mid-level specialists;

For a senior work producer, at least two years of work experience in the field of professional activity as a work producer.

1.3. The foreman must know:

1) requirements of the legislation of the Russian Federation for the composition, content and execution of project documentation;

2) requirements of regulatory technical documents for the organization of construction work at a capital construction site;

3) the composition and procedure for preparing documents for issuing permits and permits for construction work at a capital construction site;

4) technologies for construction work;

5) requirements of regulatory technical documents for construction work at a capital construction site;

6) features of construction work on dangerous, technically complex and unique capital construction projects;

7) requirements of technical documents defining the composition of temporary structures and the procedure for arranging and preparing the construction site of a capital construction project (temporary communications, temporary utility premises, parking areas for construction equipment, traffic patterns, storage areas for building materials, products, structures, components);

9) types and technical characteristics of technological equipment (scaffolding, scaffolding, protective devices, fastening the walls of pits and trenches);

10) methods and methods of planning construction work (schedule plans, operational plans, work schedules);

11) requirements of the legislation of the Russian Federation in the field of labor protection, fire safety and environmental protection;

12) labor protection and fire safety requirements during construction work;

13) basic sanitary rules and standards applied during construction work;

14) main harmful and (or) dangerous production factors;

15) types of negative impacts on the environment during various types of construction work and methods for their minimization and prevention;

16) requirements for workplaces and the procedure for organizing and conducting a special assessment of working conditions;

17) rules for maintaining documentation to monitor compliance with labor protection, fire safety and environmental protection requirements;

18) regulatory and design indicators of construction needs for material and technical resources;

19) types and properties of basic building materials, products and structures;

20) types and characteristics of main construction machines, mechanisms, power plants, vehicles used in construction work;

21) the procedure for filing applications for building materials, products and structures, equipment (tools, inventory devices), construction equipment (machines and mechanisms);

22) the procedure for acceptance and documentation of material assets;

23) methods of visual and instrumental control of the quality and volumes (quantity) of supplied material and technical resources;

24) rules for transportation, warehousing and storage of various types of material and technical resources;

25) rules for the maintenance and operation of machinery and equipment;

26) rules for insurance of warehouses and warehouse property;

27) the procedure for calculating costs associated with losses (damage, obsolescence);

28) the procedure for drawing up reporting documentation on the use of material assets;

29) requirements of technical documents for organizing construction work at a capital construction site;

30) requirements for structural elements of a building (premises) and common property of multi-apartment residential buildings, due to the need for their accessibility and compliance with the special needs of people with disabilities;

31) methods of medium-term and operational planning of construction work;

32) requirements of technical documents and design documentation for the procedure and technology of construction work;

33) the procedure for carrying out economic and financial relationships with customers and contractors;

34) methods for determining the types, complexity and volumes of construction work and production tasks;

35) basic technologies for construction work;

36) rules for maintaining executive and accounting documentation during construction work;

37) requirements of the legislation of the Russian Federation in the field of technical regulation in construction;

38) requirements for technical and design documentation for the composition and quality of construction work at a capital construction site;

39) requirements for technical and technological documentation for the composition and content of operational control of construction processes and (or) production operations during construction work;

40) requirements of technical documentation for the procedure for accepting hidden work and building structures that affect the safety of a capital construction project;

41) methods and means of instrumental quality control of the results of construction work;

42) schemes for operational quality control of construction work;

43) methods and means of eliminating defects in the results of construction work (the use of alternative technologies for the production of work, materials and components, advanced training of workers);

44) main provisions of the quality management system;

45) the procedure for drawing up internal reporting on quality control of construction work;

46) requirements of the legislation of the Russian Federation for the procedure for acceptance and transfer of completed capital construction projects and stages (complexes) of work;

47) requirements of the construction contract for the specification of the object, the procedure for delivery and acceptance of the completed capital construction project and stages (complexes) of work, the availability of accompanying documentation and the deadlines for the delivery of work;

48) the grounds and procedure for making a decision on the conservation of an unfinished capital construction project;

49) the scope of work on conservation of an unfinished capital construction project and the procedure for their documentation;

50) rules for documenting the acceptance and delivery of construction work results;

51) methods of technical and economic analysis of production and economic activities during construction work;

52) the main factors for increasing the efficiency of construction work;

53) methods and means of organizational and technological optimization of construction work;

54) promising organizational, technological and technical solutions in the field of construction work;

55) the basic requirements of the labor legislation of the Russian Federation, the rights and obligations of employees;

56) methods for calculating the need for construction work in labor resources;

57) basic principles and methods of managing labor collectives;

58) internal labor regulations, job descriptions, employment contracts;

59) basic methods for assessing labor efficiency;

60) types of documents confirming professional qualifications and availability of access to certain types of work;

61) methods of conducting standard control of the implementation of production tasks and individual works;

62) the main forms of organizing vocational training at the workplace and in the workforce;

63) grounds for prosecution and measures of administrative and criminal liability for violation of the labor legislation of the Russian Federation;

64) ……… (other documents, materials, etc.)

1.4. The foreman must be able to:

1) check the completeness and quality of design documentation, assess the compliance of the technical information contained in it with the requirements of regulatory technical documentation;

2) prepare documents for obtaining permits and permits for construction work at a capital construction site;

3) make calculations of the compliance of the volumes of production tasks and calendar plans for construction work with regulatory requirements for labor and material and technical resources;

4) carry out planning and marking of the construction work site at the capital construction site;

5) determine the composition and volume of auxiliary work for the preparation and equipment of the construction work site;

6) determine harmful and (or) dangerous factors of the impact of construction work, the use of construction equipment on workers and the environment;

7) determine the list of works to ensure the safety of the construction site (fencing the construction site, fencing or marking hazardous areas, lighting, provision of fire extinguishing means, emergency communications and alarms);

8) determine the list of necessary means of collective and (or) individual protection of workers;

9) determine the list of necessary provision of workers with household and sanitary facilities;

10) determine the list of workplaces subject to special assessment of working conditions;

11) draw up documentation for compliance with labor protection, fire safety and environmental protection requirements;

12) determine the nomenclature and calculate the volumes (quantities) and schedule for the supply of material and technical resources in accordance with production tasks and calendar plans for construction work at the capital construction site;

13) develop operating schedules for construction equipment, machines and mechanisms in accordance with production tasks and calendar plans for construction work at a capital construction site;

14) determine the necessary list and volume of resources supplied through external engineering networks (water, electricity, heat) in accordance with the requirements of calendar plans and schedules for construction work at a capital construction site;

15) carry out documentary, visual and instrumental quality control of supplied material and technical resources;

16) carry out documentation of the application, acceptance, distribution, accounting and storage of material and technical resources (application, statement of consumption and write-off of material assets);

17) develop and monitor the implementation of calendar plans and schedules for construction work;

18) determine the types and complexity, calculate the volume of construction work and production tasks in accordance with the available material and technical resources, the specialization of contractors, the specialization and qualifications of teams, units and individual workers;

19) determine the compliance of the technology and results of the types of construction work being carried out with project documentation, regulatory technical documents, technical specifications, technological maps, maps of labor processes;

20) provide documentary support for the construction work (work production logs, work time sheets, work completion certificates);

21) monitor compliance with technological regimes established by technological maps and regulations;

22) carry out visual and instrumental quality control of the results of construction work;

23) carry out visual and instrumental (geodetic) control of the positions of elements, structures and parts of a capital construction project (structure, structure), utility networks;

24) carry out a comparative analysis of the compliance of current quality control data on the results of construction work with the requirements of regulatory technical and design documentation;

25) establish the reasons for deviations of the results of construction work from the requirements of regulatory technical, technological and design documentation;

26) provide documentary support for the results of operational quality control of work (log of operational quality control of work, acts of hidden work, acts of intermediate acceptance of critical structures);

27) carry out documentary support of acceptance control in the documents provided for by the quality management system in force in the organization (work logs, acts of hidden work, acts of intermediate acceptance of critical structures);

28) develop measures to ensure compliance of the results of construction work with the requirements of regulatory technical documents and the terms of the construction contract;

29) develop executive and technical documentation for completed stages and complexes of construction work;

30) carry out a technical and economic analysis of production and economic activities during construction work at a capital construction site;

31) develop and plan measures to improve the efficiency of production and economic activities;

32) calculate the economic effect from optimizing the use of material and technical resources, increasing the level of mechanization and automation, rational methods and forms of labor organization during construction work;

33) calculate the required number, professional and qualification composition of workers in accordance with production tasks and calendar plans for construction work at a capital construction site;

34) determine the optimal structure for the distribution of workers to fulfill calendar plans for construction work and production tasks;

35) assess the effectiveness and quality of employees’ performance of production tasks, the effectiveness of employees’ performance of official (functional) duties;

36) carry out standard control of the implementation of production tasks and individual works;

37) make proposals on incentive and penalty measures;

38) ……… (other skills and abilities)

1.5. The foreman in his activities is guided by:

1) ……… (name of the constituent document)

2) Regulations on ……… (name of structural unit)

3) this job description;

4) ……… (names of local regulations regulating labor functions by position)

1.6. The foreman reports directly to ……… (name of the manager’s position)

1.7. The foreman manages ……… (name of the structural unit)

1.8. During the period of absence of the work performer (vacation, temporary disability, etc.), his duties are performed by a deputy (an employee appointed in the prescribed manner, who acquires the corresponding rights and is responsible for failure to perform or improper performance of the duties assigned to him in connection with the replacement).

1.9. ……… (other general provisions)

2. Labor functions

2.1. Organization of construction work at a capital construction site:

1) preparation for construction work at a capital construction site;

2) logistical support for construction work at a capital construction site;

3) operational management of construction work at a capital construction site;

4) quality control of construction work at a capital construction site;

5) preparing the results of construction work for delivery to the customer;

6) increasing the efficiency of production and economic activities during the construction of a capital construction project;

7) management of workers during the construction of a capital construction project.

2.2. Supervises subordinate employees.

2.3. ……… (other functions)

3. Job responsibilities

3.1. The foreman performs the following duties:

3.1.1. As part of the labor function, preparation for construction work at a capital construction site:

1) exercises control over design documentation for a capital construction project;

2) issues permits and permits for construction work at a capital construction site;

3) carries out the development and approval of calendar plans for construction work at the capital construction site;

4) prepares the construction site, construction work sites and workplaces in accordance with the requirements of labor protection, fire safety and environmental protection;

5) carries out planning and control of the implementation and documentation of employee training in accordance with labor protection and fire safety requirements;

6) monitors compliance with labor protection, fire safety and environmental protection requirements at the capital construction site;

7) prepares work sites and workplaces for a special assessment of working conditions;

3.1.2. As part of the labor function, logistical support for construction work at a capital construction site:

1) determines the need for construction work at a capital construction site in material and technical resources;

2) determines the list of construction equipment, machines and mechanisms required to carry out construction work at the capital construction site;

3) exercises control over the quality and volume (quantity) of material and technical resources;

4) carries out application, acceptance, distribution, accounting and storage of material and technical resources;

5) carries out planning and control of the expenditure of funds for logistical support for construction work at a capital construction site.

3.1.3. As part of the labor function, operational management of construction work at a capital construction site:

1) carries out operational planning and control of the execution of construction work and production tasks at the capital construction site;

2) distributes production tasks between foremen’s sections, teams and individual workers, as well as contractors;

3) monitors compliance with construction technology;

4) carries out the development, planning and control of the implementation of operational measures aimed at correcting defects in the results of construction work at a capital construction site;

5) maintains current and as-built documentation on the types of construction work performed.

3.1.4. As part of the labor function, quality control of construction work at a capital construction site:

1) carries out operational control of individual construction processes and (or) production operations;

2) monitors the compliance of the provisions of elements, structures and parts of a capital construction project (building, structure), utility networks with the requirements of regulatory technical and design documentation;

3) carries out ongoing quality control of the results of construction work;

4) identifies the reasons for deviations of the results of construction work from the requirements of regulatory technical and design documentation;

5) carries out the development and implementation of measures aimed at eliminating the causes of identified deviations in the results of construction work from the requirements of regulatory technical and design documentation;

6) carries out acceptance control of completed types and stages of construction work (elements, structures and parts of the building (structure, structure), utility networks);

7) implements and improves the quality management system.

3.1.5. As part of the labor function, preparing the results of construction work for delivery to the customer:

1) monitors the implementation of measures to ensure compliance of the results of construction work with the requirements of regulatory technical documents and the terms of the construction contract;

2) prepares as-built technical documentation to be submitted to the acceptance committees;

3) presents the results of construction work and executive and technical documentation to the acceptance commissions.

3.1.6. As part of the labor function, increasing the efficiency of production and economic activities during the construction of a capital construction project:

1) determines the main factors, plans and monitors the implementation of measures to increase the efficiency of production and economic activities and labor productivity at a capital construction site;

2) optimizes the use of material, technical and other resources for construction work, reducing non-production costs;

3) increases the level of mechanization and automation of construction work, introduces new equipment;

4) conducts a technical and economic analysis of the results of measures to improve the efficiency of production and economic activities at a capital construction site.

3.1.7. As part of the labor function, management of workers during the construction of a capital construction project:

1) determines the labor resource requirements for construction work at a capital construction site;

2) arranges workers for the construction of a capital construction project according to workplaces, foremen’s sections, teams and units;

3) carries out distribution and control of employees’ performance of production tasks and individual works;

4) monitors employees’ compliance with internal labor regulations;

5) improves the professional level of workers at the construction site.

3.1.8. As part of the labor function, management of subordinate employees:

1) distributes labor functions and official tasks among subordinate employees and exercises control over their implementation;

2) provides subordinate employees with advisory support, gives explanations and instructions within the framework of the performance of labor functions by subordinate employees;

3) ensures compliance with labor legislation and labor protection legislation in relation to subordinate employees, creation of working conditions that meet established requirements;

4) resolves conflict situations between subordinate employees;

5) submits for consideration ……… (name of the manager’s position)

ideas about the hiring, transfer and dismissal of employees; proposals for

their encouragement or the imposition of penalties on them.

6) ……… (other duties)

3.1.9. As part of the performance of their labor functions:

1) carries out instructions from his immediate supervisor;

2) undergoes periodic medical examinations (examinations), and

extraordinary medical examinations (examinations) in accordance with the established

legislation of the Russian Federation in order.

3.1.10. ……… (other duties)

3.2. ……… (other provisions on job responsibilities)

4. Rights

4.1. The foreman has the right:

4.1.1. Participate in discussions of draft decisions of the organization’s management, in meetings on their preparation and implementation.

4.1.2. Manage the material resources entrusted to him within the limits of his competence.

4.1.3. Sign and endorse ……… (types of documents)

4.1.4. Initiate and conduct meetings on the organization of production activities.

4.1.6. Initiate and conduct meetings on production and economic issues.

4.1.7. Conduct quality checks and timely execution of orders.

4.1.8. Demand cessation (suspension) of work (in case of violations, non-compliance with established requirements, etc.), compliance with established standards; give instructions to correct deficiencies and eliminate violations.

4.1.9. Get acquainted with draft decisions of management relating to the function he performs, with documents defining his rights and responsibilities for his position, criteria for assessing the quality of performance of his labor functions.

4.1.10. Participate in discussions of issues related to the duties performed by him.

4.1.11. Require the management of the organization to provide assistance in the performance of its official duties and rights.

4.1.12. ……… (other rights)

5. Responsibility

5.1. The foreman is held accountable:

For improper performance or failure to fulfill one’s job duties as provided for in this job description - in the manner established by the current labor legislation of the Russian Federation;

For offenses and crimes committed in the course of their activities - in the manner established by the current administrative, criminal and civil legislation of the Russian Federation;

For causing damage to the organization - in the manner established by the current labor legislation of the Russian Federation.

5.2. ……… (other liability provisions)

6. Final provisions

6.1. This job description has been developed on the basis of the Professional Standard "", approved by Order of the Ministry of Labor and Social Protection of the Russian Federation dated June 26, 2017 N 516n, taking into account ……… (details of local regulations of the organization)

6.2. The employee is familiarized with this job description upon hiring (before signing the employment contract).

The fact that the employee has familiarized himself with this job description is confirmed by ……… (by signature on the familiarization sheet, which is an integral part of this instruction (in the journal of familiarization with job descriptions); in a copy of the job description kept by the employer; in another way)

6.3. ……… (other final provisions).

Download the job description for a foreman(.doc, 69KB)

I. General provisions

  1. The work manager (foreman) belongs to the category of managers.
  2. A person with a higher professional (technical) education and work experience in construction in engineering and technical positions of at least 3 years or secondary vocational (technical) education and work experience in construction in engineering and technical positions of at least 5 years.
  3. Appointment to the position of work producer (foreman) and dismissal from it is carried out
  4. The work manager (foreman) must know:
    1. 4.1. Organizational and administrative documents and regulatory materials of higher and other bodies relating to the production and economic activities of the site (facility).
    2. 4.2. Organization and technology of construction production.
    3. 4.3. Design and estimate documentation for objects under construction.
    4. 4.4. Construction norms and rules, technical conditions for the production and acceptance of construction, installation and commissioning works.
    5. 4.5. Forms and methods of production and economic activity at the site (facility).
    6. 4.6. Standards and prices for work performed.
    7. 4.7. Legislative and regulatory legal acts on remuneration.
    8. 4.8. The procedure for economic and financial relationships between the contracting organization and customers and subcontractors.
    9. 4.9. System of production and technological configuration and dispatching of a construction organization.
    10. 4.11. Scientific and technical achievements and experience in organizing construction production.
    11. 4.12. Fundamentals of economics, organization of production, labor and management.
    12. 4.13. Labor legislation.
    13. 4.14. Internal labor regulations.
    14. 4.15. Rules and regulations of occupational health, safety, industrial sanitation and fire protection.
  5. During the absence of the work manager (illness, vacation, business trip, etc.), his duties are performed by a person appointed in the prescribed manner. This person acquires the corresponding rights and is responsible for the proper performance of the duties assigned to him.

II. Job responsibilities

Work foreman (foreman):

  1. Manages the production and economic activities of the site.
  2. Ensures the fulfillment of production tasks for putting objects into operation on time and performing construction, installation and commissioning work in accordance with all quantitative and qualitative indicators in compliance with work plans.
  3. Organizes construction and installation work in accordance with design documentation, building codes and regulations, technical specifications and other regulatory documents.
  4. Ensures compliance with the technological sequence of construction and installation work on the site.
  5. Carries out measures to increase the level of mechanization of work, introduce new equipment, improve labor organization, reduce the cost of construction, installation and commissioning work, and economical use of materials.
  6. Carries out work to disseminate advanced techniques and methods of work.
  7. Provides technical documentation for the construction of facilities.
  8. Prepares requests for construction machinery, transport, mechanization, materials, structures, parts, tools, inventory and ensures their effective use.
  9. Keeps records of work performed and prepares technical documentation.
  10. Participates in the delivery to customers of completed construction projects, individual stages and complexes of work on constructed facilities.
  11. Prepares the scope of work for subcontractors (specialized) organizations and participates in the acceptance of completed work from them.
  12. Issues permits for the right to carry out work in protected zones.
  13. Sets production tasks for the craftsmen regarding the volume of construction, installation and commissioning work, and monitors their implementation.
  14. Instructs workers directly at the workplace on safe methods of performing work.
  15. Ensures the use of technological equipment (scaffolding, scaffolding, protective devices, fastening the walls of pits and trenches, struts, conductors and other devices), construction machines, power plants, vehicles and protective equipment for workers.
  16. Ensures compliance with the rules for carrying heavy loads, cleanliness and order in workplaces, aisles and access roads, proper maintenance and operation of crane tracks, and provision of workplaces with safety signs.
  17. Organizes on-site storage facilities and protection of material assets.
  18. Monitors the state of safety regulations and takes measures to eliminate identified deficiencies, violations of industrial sanitation rules, and compliance by workers with labor protection instructions.
  19. Ensures that employees comply with production and labor discipline, makes proposals to impose disciplinary sanctions on violators.
  20. Provides assistance to innovators.
  21. Organizes advanced training for workers and conducts educational work in the team.

III. Rights

The work performer (foreman) has the right:

  1. Get acquainted with the draft decisions of the director of the organization relating to his activities.
  2. Submit proposals for improvement of work related to the responsibilities provided for in these instructions for consideration by management.
  3. Within the limits of your competence, inform your immediate supervisor about all shortcomings in the activities of the organization (its structural divisions) identified during the performance of official duties and make proposals for their elimination.
  4. Interact with the heads of all (individual) structural divisions of the organization.
  5. Sign and endorse documents within your competence.
  6. Require the director of the organization to provide assistance in the performance of his official duties and rights.

IV. Responsibility

The work manager (foreman) is responsible for:

  1. For improper performance or failure to fulfill one’s job duties as provided for in this job description - within the limits determined by the current labor legislation of the Russian Federation.
  2. For offenses committed in the course of carrying out their activities - within the limits determined by the current administrative, criminal and civil legislation of the Russian Federation.
  3. For causing material damage - within the limits determined by the current labor and civil legislation of the Russian Federation.

The construction of any facility is carried out in accordance with working drawings, estimates, and regulatory documents. The construction process is managed by the work foreman (in short, foreman). The responsibilities of a construction foreman are enormous and responsible. The quality of the constructed facility depends on his competence and professional literacy.

An employee with a higher education in construction and with at least three years of experience in this profile is appointed to the position of foreman. Or secondary technical education with at least five years of experience.

The range of responsibilities of a construction foreman is very wide. There are two main areas of his activity:

  • Responsibilities regarding the organization of the construction process.
  • Responsibilities regarding labor protection and compliance with safety regulations.

I would like to outline in detail the job responsibilities of a foreman, not in a template version, but how they are actually implemented in practice. Take, for example, newly starting construction.

Preparatory stage

After receiving the technical documentation with the stamp “for work in progress,” you should familiarize yourself with the construction organization project (COP), where the location of temporary buildings and structures is indicated in the construction plan.

These are household premises, foreman's rooms, open and closed warehouses, fencing, driveways, temporary electricity and water supply networks, etc. In accordance with this, the construction site is being arranged.

At the same time, the design and estimate documentation is being studied, which is the responsibility of the construction foreman. When comments are identified, appropriate acts are drawn up for presentation to the design organization.

The production department issues a logbook for the production of concrete and welding works (if necessary). As well as logs of work performed, forms of acts for hidden work, filling out which is the responsibility of the foreman.

Necessary knowledge for a foreman

  • Read drawings fluently, be familiar with estimates, regulatory documentation, and construction work standards;
  • Know the technological sequence of processes, organization of construction production;
  • Correctly build relationships with subcontracting companies, provide them with a timely front for special work, and accept them in accordance with the standards;
  • Be able to use geodetic instruments (level, theodolite), and, if necessary, promptly give working marks;
  • Provide requests for materials, attach drawings of orders, when required, indicating all parameters, grades, sections;
  • Interact with the customer’s representative not only when signing interest payments, but also when performing hidden construction work. When constructing critical structures, author’s supervision should also be invited;
  • Monitor labor discipline and internal regulations at the construction site;
  • Know the standards for safety, labor protection, industrial sanitation and fire protection.

Execution of construction work

The daily responsibilities of a construction foreman include planning and organizing the construction process. To do this, a monthly list of the volumes required by technology for implementation is compiled.

The required amount of materials for this is calculated according to the material consumption standards. This request is processed by the production department. Then it is placed among suppliers of structures, materials, and other products.

On a daily basis, orders are made for the necessary materials, equipment, transport, small-scale mechanization equipment, and other needs.

It is the responsibility of the construction site foreman to give the foreman a task for the working day before the start of the shift. If necessary, working drawings should be reviewed together with the foreman.

It also happens that I had to sketch sketches indicating dimensions. At the same time, mandatory control over execution is provided to avoid errors. The completed structural elements must strictly comply with the working drawings.

If it is necessary to replace materials, this must be agreed upon with the design institute through the customer’s representative - a technical supervision engineer.

One of the main responsibilities of the foreman is strict quality control, elimination of regulations of regulatory authorities, technical supervision to ensure the reliability and durability of the structures being built.

During construction, be sure to monitor the state of safety regulations at the site to prevent injuries and accidents.

Before starting construction work, the foreman must instruct workers in terms of safety precautions.

Instruction can be divided into:

  • Initial briefing (upon hiring an employee);
  • Repeated (at least once every three months);
  • Extraordinary briefing (if the nature of construction work changes);
  • Current or target (for example, when issuing a permit).

Maintaining documentation is the responsibility of a construction foreman.

The foreman must draw up the following as-built documentation:

Daily completion of the work production log.

Fill out and sign acts for hidden work from technical supervision.

Provide the necessary execution plans.

Monthly collection of passports, laboratory test results, certificates, and other documents for subsequent submission to the production and technical department.

Drawing up registers for incoming products, materials, structures, for submission to the management accounting department (for material accounting).

At the end of each month, calculate the volumes completed and present them to the customer’s representative for signing. Based on this, the production department calculates the completion and generates a report of completed work.

The production department processes percentages and, according to production standards, writes off materials assigned to the foreman in the M-29 form. Based on this, the accounting department writes off these materials from the foreman’s report for the month.

To summarize, we can briefly outline what the foreman’s responsibilities include in organizing the construction process.

Main responsibilities of a foreman

Organization of construction production in strict accordance with the project, PPR, and regulatory framework.

Compliance with safety and labor protection requirements. This is a big topic that I will cover in future publications.

Strictly adhere to the technological sequence of the construction processes performed.

The foreman prepares requests for the supply of material assets, equipment, equipment, small-scale mechanization, tools, etc.
Controls their effective use.

The responsibilities of a construction foreman include mechanizing processes in every possible way, introducing rationalization proposals in order to reduce costs and reduce construction time.

The foreman must keep strict records of the volumes completed, report for them within the established time limits, and maintain as-built documentation to the prescribed extent.

Provide work scope to related subcontractors, coordinate their joint and uninterrupted activities. Ensure that deadlines are met so as not to hinder the parallel work of several subcontractors.

Organize activities to improve the level of qualifications of workers to increase the rank of the qualification commission.

Link the joint activities of subcontracting units into a single construction process. Issue production tasks to craftsmen subordinate to the foreman and supervise them.

Monitor compliance with production and labor discipline. In cases of violation, petition the administration to impose disciplinary sanctions.

According to the profile of the profession in the following areas, certification of the foreman must be carried out :

Compliance with building codes and regulations.

On safety precautions and labor protection.

For the safe conduct of construction work with cranes.

Be certified in electrical safety.

On safe work with gas.

On construction in seismic areas.

Construction on subsidence soils.

The main task of any construction process is the timely delivery of a well-built facility into operation. In addition, the economic cost should not exceed the financial estimate (FFR). The responsibilities of a construction foreman are aimed at achieving assigned tasks.

Today construction production is at its peak. It is specific and dangerous, which requires proper organization. Each construction site must have a manager. His task will be to set deadlines, put the facility into operation, organize the production process, and record the work. This is done by the work manager or foreman. His job is very responsible as it has a wide range of responsibilities. For this specialty, you should have a carefully developed job description, which will spell out duties, rights and responsibilities.

Education and experience are important criteria for the specialty of a foreman. For a candidate with a higher education, it is enough to have three years of experience. For people with secondary education, a record of five years of work experience in the relevant field is required.

In addition to these requirements, the employee must be purposeful and responsible. Employers often pay attention to accuracy, knowledge of technical documentation and the ability to quickly solve assigned tasks. A competent specialist will allow you to complete construction work on time without compromising quality. These qualities should be taken into account when writing DIs.

Legislation

When drawing up the DI, you should take into account the requirements of the law, which indicate the obligations of the employee. Information sources:

  • innovative construction methods;
  • coordination papers for construction;
  • papers on design and estimate documentation;
  • documents on the organization and progress of the technical process;
  • standards, SNiP for production, acceptance of objects;
  • probable methods of carrying out the work;
  • standards and prices for all types of classes;
  • wage standards;
  • basics of settlements with contractors;
  • fundamentals of economics and management;
  • basics of logistics, PTK;
  • fire safety standards, labor protection, sanitary rules;
  • internal documentation of the organization.

Knowledge of these documents will allow the foreman to perform tasks quickly and safely. You should not ignore these conditions when writing DI. Gaps in legislation will cause problems at serious facilities.

The work contractor must rely on current legislation, the charter and internal documentation of the company and DI. The specialist is obliged to perform work in accordance with these documents.

Features of the specialty

The foreman is part of the middle management team. Only a person with a higher technical or construction education can become one. He is engaged in full supervision of the implementation of construction and installation works. The decision to hire or dismiss from this position can only be made by the director of the organization. The foreman will report only to the head of the enterprise or his deputy. Some holdings have created a complex structure with an intermediate link to which the employee in question will report.

The work contractor must:

  • know about the features of drawing up constituent documents, draw up regulatory documentation for higher organizations, covering production activities;
  • have an understanding of the organization of the construction of the facility and the management of technical processes, understand design and estimate documentation.

Additionally, the foreman must have the following knowledge:

  • production activity standards;
  • methodology and formation of economic activity;
  • step-by-step acceptance of installation, commissioning and commissioning work;
  • wage coefficients, prices and standards for the types of work performed;
  • algorithm for conducting financial and business activities with contractors and subcontractors.

Required knowledge and skills:

  • Reading drawings, estimates, rationing construction work.
  • To navigate the technical sequence of processes and organization of construction production.
  • Be able to properly build relationships with subcontractors, provide a front line for special work and accept them.
  • Use geodetic instruments.
  • Submit requests for materials, if necessary, attach drawings with the required parameters.
  • Communicate with customers when signing interest orders and performing hidden work; for complex structures, organize author’s control.
  • Monitor labor discipline at the construction site.
  • Know the safety rules, labor protection, etc.

A person must be able to analyze the current situation and systematize the acquired knowledge in his work. His competence includes monitoring production work and adjusting work schedules. The employee must know safety precautions, labor protection standards, and fire regulations. When working, you should rely on the company’s charter, current legislation and internal documentation.

The foreman is subordinate to the director. All adjustments and changes in work must be agreed with him.

In the absence of a foreman for various reasons, a deputy must be appointed by the director in the prescribed manner. The incumbent bears similar responsibilities and has the same rights.

Responsibilities

The foreman is engaged in production activities, performs and checks the commissioning of the facility, sets and controls deadlines, and ensures an increase in economic indicators. It certifies the compliance of the work performed with the design program and technical specifications.

The job description must indicate that the foreman is required to control the technical sequence of production. He must mechanize as much as possible and bring it to a given level. It is important to timely improve the organization of production, reducing the cost of installation and construction work. The quality of work and the elimination of deviations identified by regulatory authorities are separately monitored. Regular technical supervision is necessary to ensure the durability and reliability of structures.

Every day before work, the foreman must be given a work assignment and, if necessary, review the working drawings together. In some cases, adjustments are made and then compliance is monitored.

All material should be used sparingly. A specialist must constantly improve his knowledge and skills and effectively use innovative techniques in his work. To accurately determine the required volume, accepted standards are used. The submitted application must be processed by the production department and then placed with suppliers. If there is a need to replace materials, it is necessary to obtain approval from the design institute through a technical supervision engineer.

Construction sites must be provided with construction documentation in a timely manner, and managers must have up-to-date information.

The foreman must also prepare requests for materials and equipment if necessary. There must be a package of technical documentation for the work performed.

All projects must be completed within the specified time frame. To do this, the foreman plans the organization of the construction process on a daily basis and every month creates a list of required volumes.

The foreman determines the admission of various persons to the production process. He organizes the plan and controls its implementation. At the workplace, all employees must be given instructions, which is reflected in a special log. During the work process, the work manager must decide on the use of technological equipment for various purposes: protective devices, transport, construction machines.

The foreman is responsible for labor protection. He must not only know the rules, but also monitor their compliance. For example, standards for carrying heavy objects, maintaining order and cleanliness. Workers are required to observe labor and production discipline. Before work, they must undergo all the necessary training:

  • primary;
  • repeated (every 3 months);
  • extraordinary (when making changes);
  • target (for certain cases).

This specialist is a financially responsible person and is responsible for the safety of the entrusted property.

To summarize, we can say that the foreman monitors every detail. DI obliges the employee to monitor the condition and operation of production equipment. He will be responsible for organizing and conducting educational work on labor protection standards, fire safety, etc.

For proper internal management, the functions of the CI must be clearly defined. Here is an approximate list that can be adjusted depending on the specialization and assigned tasks:

  • Organization of management. The entire scope of the work process must be under the control of the foreman. At the reporting site, he must monitor compliance with safety regulations.
  • Timely delivery of objects. The team must deliver objects on time, observing the required quality and design documentation.
  • Organization of the production process. Construction must be provided with technical and regulatory tasks; monitoring of their implementation is necessary.
  • Control over technical sequence. The foreman must eliminate violations of the sequence of work, which requires constant monitoring of the work order. If this requirement is ignored, technical difficulties arise that require elimination.
  • Optimization. The boss must introduce modern technologies and equipment, strive for the rational use of labor reserves and materials. Savings will allow you to invest in the approved budget.

  • Reception of technical documentation for the facility. Responsibilities include obtaining a design for construction.
  • Records management. The specialist must keep detailed records of the receipt of resources and document the work process.
  • Submitting applications. After receiving the task, the foreman draws up a list of necessary equipment, raw materials, and human resources for their implementation.
  • Report to customers. The foreman must take an active part in the commissioning of the object and explain in detail to the customer the points of interest.
  • Communication with subcontractors. In a developed structure, a specialist is required to communicate with subordinate units and evaluate their performance.
  • Briefing. The employee must communicate to the builders the deadlines for the construction of the facility, explain the technology and safety precautions.
  • Issuance of special passes. At the site, all employees must have a document allowing them to be on site. The foreman is preparing them.
  • Work with personnel. A managerial position must carry out disciplinary sanctions against unscrupulous employees and improve the qualifications of personnel. The boss is obliged to take into account the proposals of his subordinates to reduce construction time; good innovative ideas must be implemented.
  • Organization of the economic component. He must organize a temporary warehouse of material resources and identify a financially responsible employee.
  • Logistics support. The foreman must ensure timely receipt of equipment, tools, materials and machines, etc.
  • Monitoring compliance with safety measures and sanitary standards. Access to each area must be safe and unobstructed.

The work foreman must be on the construction site at all times to ensure the fulfillment of assigned duties. He must monitor the activities of lower management and their compliance with regulatory and design documentation.

In a small organization, the foreman may be assigned additional responsibilities. For example, temporarily replacing an absent employee, demonstrating to subordinates the correct completion of the assigned task.

Rights

The DI prescribes the rights of a specialist. First of all, he can change the production process and improve it, since he is fully responsible for the results and deadlines. He has the authority to reward or punish subordinate workers who have distinguished themselves.

The work contractor has the right to create a request to obtain information necessary for the correct organization of the production process. He can request design decisions from management, demand that the director fulfill his duties to fulfill technical and organizational conditions.

Responsibility

The presence of duties and rights implies a certain responsibility. The specialist’s actions must be consistent and competent, orders must be strict and concise. Ignoring the responsibilities specified in the DI and the law will result in penalties or dismissal. Any illegal actions during work are punishable by the administrative and criminal codes. In case of equipment damage or material damage, adequate compensation is provided.

Financial liability must be indicated in the DI as a separate paragraph. Typical positions in it:

  • generation of documentation;
  • timely delivery of the object;
  • compliance with technical and design standards;
  • economical use of resources;
  • regular submission of reports on work performed;
  • control of workers;
  • compliance with orders, compliance with laws and safety standards.

For non-compliance with the listed points, the employer may use penalties against the work contractor.

Performance evaluation

The head of the organization must regularly evaluate the professional performance of the foreman. The analysis takes into account knowledge of safety precautions, labor protection, implementation of the production process and its compliance with project documentation. If the above conditions are met, the foreman will be considered a good specialist.

Competence

The foreman has extensive power. His instructions in the brigade become mandatory for execution. The specialist must organize the selection and rotation of workers on the site. If there is a need for reward or punishment, the work manager transmits information to the manager and makes suggestions.

This specialty occupies an intermediate place between ordinary employees and management personnel. The person on it will have direct contact with management. His competence will include issues related to modernization of production and savings. The foreman negotiates to identify defects and defects. He must formulate precise recommendations to eliminate mistakes.

The right of such specialists is to demand assistance from senior management. He has the right to insist on studying the papers on the work of the transferred production zone. In addition, he can sign papers in his area of ​​competence. As you can see, the future foreman will perform intermediary and organizational functions.

The work manager is a line engineering and technical specialist. He manages production and resolves economic issues of the site. A candidate for a position is subject to a number of requirements, including not only higher education and work experience, but also possession of certain knowledge and skills.

The project manager is a role that is widely understood in most industries - and construction is no different in this regard. At a construction site, this is the person who controls and coordinates everyone else. They are also called foremen.

They are not necessarily super specialists or the best architects/builders, but what is certain is that their role is to coordinate and manage a selected and trained team of people to deliver a project. Superintendents allow owners to feel almost completely free from the hassle associated with building a house.

What are the responsibilities of a foreman?

A professional team leader can play an additional role in the project, for example, he can act as an architect or an expert in personnel selection and hiring special equipment.

The foreman's responsibilities also include:

  1. Managing daily work on the construction site;
  2. Attracting design and technical experience to the project;
  3. Monitoring compliance with safety and labor protection standards at construction sites;
  4. Work with all contracts and estimates;
  5. Management of procurement, transactions and relationships with contractors;
  6. Monitoring compliance with legislation;
  7. Has established connections, which allows the customer to have discounts on materials and services;
  8. Monitoring the safety and correct storage, consumption of building materials, as well as their correct installation;
  9. Ensuring that the home under construction meets all project specifications;
  10. It can improve the pace of construction and increase pressure on contractors where necessary.

How to hire a good foreman?

Finding a good project manager is like searching for gold, but it's worth it. You can use the following recommendations:

  • Start with professional associations, SROs in private housing construction. Such organizations provide accreditation and certification for professional project managers; it is quite difficult to get there, which is a guarantee of professionalism. You can go to their websites, visit their offices and choose the most suitable company;
  • Learn as much information as possible about the foreman: his experience, completed work, portfolio, individual expertise. This needs to be done in person, when meeting: today, as a rule, we look for a lot on the Internet, and forget that face-to-face communication is the best way to establish trust and confidence in the interlocutor. If you have any doubts after the meeting, it is better to look for another foreman;
  • Personal recommendations are always a good source, but remember that each project is individual, there are subtleties in the construction process, and many circumstances that affect the progress of projects and the people involved in them. In this case, it is important not to rely entirely on someone else’s opinion, but also to use “your head,” ask for facts and analyze.

How much should a foreman be paid?

All costs are estimated, usually as a percentage of the estimated cost of the project - this gives the superintendent an idea of ​​what level of remuneration they can expect.

Before appointing a foreman, it is better to document everything - by signing a contract with a pre-agreed price for his services. Otherwise, you risk seriously overpaying if something goes wrong, the deadlines are delayed or the costs of construction and materials increase.

And remember that the main task of the foreman is to save you money and eliminate the unnecessary hassle associated with building a house. You hire this person to ensure that construction goes smoothly and that the facility is built with high quality and in strict accordance with the project. A good foreman is not cheap, but his work compensates for most of the potential risks and costs that may arise in the future.