The final individual project of students of the Federal State Educational Service. Individual project as a means of implementing fgos

MBOU "Rylskaya Secondary School No. 4"

Accepted Approved

pedagogical council by order of the director

MBOU "RSOSH №4" MBOU "RSOSS №4"

Protocol No. ____ Order No. _______.

from ______ _____201 _-y from ______ _____201_-y

_________________

POSITION

on the individual final project of the student according to GEF OOO

    Are commonprovisions

    1. This Regulation has been developed in accordance with the requirements of the federal state educational standard (FGOS) of the main general education, The main educational program of basic general education (FGOS LLC) MBOU "Rylskaya secondary school No. 4".

      This Regulation regulates the activities of the school in organizing work on the final individual project (hereinafter referred to as IIP) in connection with the transition to the Federal State Educational Standard.

      An individual final project is the main object of evaluation of meta-subject results obtained by students in the course of mastering interdisciplinary curricula.

      Project activity is one of the forms of organizing the educational process and extracurricular activities, aimed at improving the quality of education, democratizing the style of communication between teachers and students. An individual final project is a project carried out by a student within one or more academic subjects.

      The completion of the final project is mandatory for each student of grades 5-7 who has switched to training according to the Federal State Educational Standard. During one academic year, the student is required to complete one final project. At the level of grades 5-7, projects carried out by students can be collective, group, dual or individual. The completion of the final project is obligatory for each student of the 9th grade studying in the second generation of the Federal State Educational Standard. The project can be subject, meta-subject, inter-subject orientation.

      The implementation of an individual final project is mandatory for each student in grades 8-9 who has switched to study according to the Federal State Educational Standard, its failure to complete it is tantamount to receiving an unsatisfactory grade in any academic subject. During one academic year, the student is required to complete one final individual project.

      The defense of an individual final project is one of the mandatory components of the materials for the system of intra-school monitoring of educational achievements.

      The mark for the implementation of the project is displayed in the column "Project activities" in the class journal and personal file. In a state document on the level of education - a certificate of basic general education - a mark is placed in a free line.

    The goals of the final individualproject

    1. For students

The formation of various key competencies, which in modern pedagogy are understood as complex personality traits, including interrelated knowledge, skills, values, as well as the willingness to mobilize them in the necessary situation.

      For teachers

The introduction of new pedagogical technologies in the educational process educational institution for the development of cognitive skills of students, the ability to independently construct their knowledge, navigate the information space, develop their critical thinking, the ability to see, formulate and solve a problem.

    Requirements for the preparation of the final individualproject

    1. The plan (program) for preparing a project for each student is developed by an educational institution.

      leaders project activities students are teachers who implement the GEF of basic general education.

      The leader, consultant of the individual final project of the student can be teaching staff, parents (legal representatives) of students, employees of other organizations according to the profile of the project (social partners).

      The student is the initiator in choosing the topic and the project leader.

      The project manager is appointed by order of the director.

      Project leaders:

Organize the student's work on individual final project,

Submit an application for project management of the student, a work plan for consideration by the methodological council of the school;

Seek advice from specialists at the request of students,

Conduct individual consultations with students experiencing difficulties at various stages of work,

They declare the participation of students in competitions of various levels. The project manager can be either a teacher of a given educational institution or an employee of another organization or other educational institution, including a higher one.

      The plan for the implementation of the final individual project is developed by the student together with the project leader. The student is guided by the deadlines and recommendations determined jointly with the supervisor. The student has the right to start work on the project starting from the 5th, 6th, etc. class.

      Deadlines for project defense are set at the beginning of the academic year.

    Requirements for content and orientationproject

    1. Projects created at the school should be devoted to one of the urgent problems of the scientific, cultural, political, legal, social life of the modern world community.

      A project may consider one aspect of a chosen problem, thereby being open, giving other creative teams the opportunity to continue exploring new aspects of this problem.

      Project work includes not only the collection, systematization and generalization of information on the problem raised, but also represents an independent study that demonstrates the author's vision of the problem, its original interpretation or solution.

      The project should have a practical orientation, be in demand and be able to be applied in a particular area of ​​human activity.

      Project assignments should be clearly formulated, goals, objectives and means clearly identified.

      Possible types of work and forms of their presentation:

Table 1

Project type

Target

Project product

Practice-oriented, social

Solving practical problems, increasing the civic engagement of students

    written work (essay, abstract, analytical materials, review materials, research reports, poster presentation, multimedia product and etc.);

    artistic creative work (in the field of literature, music, visual arts, screen arts), presented in the form of a prose or poetic work, dramatization, artistic recitation, performance of a musical work, computer animation, etc.;

    material object, layout, other design product;

reporting materials on a social project may include both texts and multimedia products.

Research

Proof or refutation of a hypothesis

Informational

Collecting information about any object or phenomenon

Creative

Creation of a creative product

    Requirements for the preparation of a projectwork

    1. The design work must be submitted in print and in electronic format(presentation, website, digital film, etc.).

      The work is done on sheets of standard A 4, in Times New Roman, font size 12 points with a line spacing of 1.5, heading -14 points with a line spacing of 1.5. Margin size: top - 2 cm, bottom - 1.5 cm, left - 3 cm, right - 2 cm.

The title page is considered first, but is not numbered.

Each new chapter starts on a new page. Do not put a dot at the end of a heading located in the middle of a line.

All sections of the plan (chapter titles, conclusions, conclusion, list of references, each appendix) begin on new pages.

All abbreviations in the text must be deciphered.

Text volume research work, including formulas and bibliography:

5 - class - up to 5 pages;

6 - class - up to 6 pages;

7 - class - up to 7 pages;

8 - class - up to 8 pages;

9 - class - up to 10 typewritten pages.

    Definition of the purpose and objectives of the study.

    different kind reference device.

    An indication of all printed, drawn, graphic, photo, video, musical and electronic materials presented in the project.

    The division into sections or chapters, presented in a logical sequence to more clearly convey the information collected.

      The composition of the materials that must be prepared upon completion of the project to protect it must include:

    the product of project activity submitted for defense, presented in one of the forms described above;

    a brief explanatory note to the project prepared by the student (no more than 10 sheets) indicating for all projects:

a) the original intent, purpose and purpose of the project,

b) a brief description of the progress of the project and the results obtained,

c) a list of sources used. For design projects, the explanatory note also includes a description of the features of design solutions, for social projects - a description of the effects / effect from the implementation of the project;

    a brief review of the head (review), containing brief description student work during the project, including:

a) initiative and independence,

b) responsibility (including the dynamics of attitude to the work performed),

V) performance discipline.

The review evaluates and highlights the main positions, taking into account the assessment of the criteria for the substantive part of the project in points.

In the final part, it is concluded whether the project has achieved its goals.

For research projects it is obligatory to have a written report on the study (no more than 10 sheets) and an appendix, including tables, photographs, drawings, diagrams, questionnaires, etc. Mandatory structural parts of a written report are an introduction and a conclusion. The introduction substantiates the relevance of the research topic, defines the goal and objectives, adequate to the subject of study, research methods. In conclusion, the results of the research work are summed up, conclusions are drawn about the accuracy of the working hypothesis.

Written report for creative projects has its own specifics, its structure necessarily describes the author's intention, the stages of product creation, the technologies and materials used. Product creative activity(product, booklet, video clip, wall newspaper, etc.) must be presented at the defense.

Implementation report social project should contain the following structural components: a description of the problem, goals and objectives of the project, alternative ways decisions, risks of project implementation; analytical description of available and missing resources for project implementation, estimates; the functions of the project participants are indicated in calendar plan, where the areas of personal participation and areas of responsibility of team members, points of intermediate monitoring are indicated. The planned project product at the end of the project is compared with the result obtained.

      Before being submitted to the expert commission, the disk with the design work must be carefully checked in relation to the technical and demonstration parameters: the launch system, the pace of movement, the strength and purity of the sound. If necessary, the disk should be provided with an explanatory note listing the programs needed to run.

      General requirement to all works is the need to comply with the rules and regulations of citation, references to various sources. In the case of borrowing the text of the work without indicating references to the source (plagiarism), the project is not allowed to be protected.

      The assessment of the student's achievement of the meta-subject results of mastering the main educational program of basic general education in the form of an individual final project is recorded in the "Project activity" or "Exam" column in the class journal and the student's personal file. In a state document on the level of education - a certificate of basic general education - is put in a free line.

      If there are appropriate grounds in the work performed, the review may also note the novelty of the approach and / or the solutions obtained, the relevance and practical significance of the results obtained.

    Deadlines and protection requirementsproject

    1. The project must be completed within one year no later than April of the current academic year.

    Preparation - the month of September;

    Planning - the first decade of October;

    Implementation of the project - October-March;

    Registration of results - the first decade of April;

    Refinement of projects and preparation for public defense of an individual educational project - until the second decade of April;

    Protection of projects - the third decade of April.

      Protection is carried out:

    at a school conference in April, which makes it possible to publicly present the results of work on projects and demonstrate the level of mastery of students by individual elements of project activities

    in the process of specially organized activities of the expert commission of MBOU "Rylskaya secondary school No. 4" in April.

The report reflects the purpose and objectives of the project, the main stages of project activities, and the results obtained. Presentation as presentation/presentation of results design work requires communication skills from students, the task that everyone has to solve is to present all the benefits of the project in the most profitable and reasonable way, taking into account the characteristics of the communication space and the audience.

      Regardless of the type of the project, its defense takes place in public: after hearing the report (5–7 minutes), the audience and the jury (expert council) ask questions about the topic of the project. Compliance with the regulations indicates the formation of the regulatory skills of the student. Time protection should be planned in such a way that the student can demonstrate the finished project product or provide materials confirming its implementation.

      A computer presentation is part of the project evaluation as one of the options for the visibility of protection, however, its creation and use should be dictated by the requirements of expediency and efficiency.

    Criteria for evaluating the final individualproject

    1. At description the results of the project implementation, a conclusion about the level of development of project activity skills is made on the basis of an assessment of the totality of the main elements of the project (product and explanatory note, feedback, presentation) for each of the four criteria:

      • ability to independently acquire knowledge and solve problems, manifested in the ability to pose a problem and choose adequate ways to solve it, including the search and processing of information, the formulation of conclusions and / or substantiation and implementation / testing decision, substantiation and creation of a model, forecast, layout, object, creative solution, etc. This criterion generally includes an assessment of the formation of cognitive learning activities;

        the formation of subject knowledge and methods of action, manifested in the ability to reveal the content of the work, competently and reasonably, in accordance with the problem / topic under consideration, use the available knowledge and methods of action;

        formation of regulatory actions, manifested in the ability to independently plan and manage their cognitive activity in time, use resource opportunities to achieve goals, make a choice of constructive strategies in difficult situations;

        formation of communicative actions, manifested in the ability to clearly state and formalize the work performed, present its results, and reasonably answer questions.

    2. Criteria for evaluating design work

table 2

1. Ability to independently acquire knowledge and solve problems

Criterion 1.1. Search, selection and adequate use of information

Points

The work contains insignificant volume relevant information from limit-

chennogo number of similar sources

The work contains sufficient volume relevant information from similar

sources

The work contains fairly complete information from diverse source

Criterion 1.2. Formulation of the problem

Points

Problem formulated, but the hypothesis absent. Action plan

fragmentary

The problem is formulated justified, a hypothesis (hypotheses) is put forward, but

action plan for proving / refuting the hypothesis not complete

The problem is formulated justified, put forward a hypothesis (hypotheses), given

detailed plan actions to prove / disprove the hypothesis

Criterion 1.3. Relevance and significance of the project topic

Points

The relevance of the project topic and its significance for the student are indicated by fragments

tarno at the assertion level

The relevance of the project topic and its significance for the student are indicated at the level

statements grounds are given

The relevance of the project topic and its significance are disclosed and substantiated by

Incidentally, the topic has relevance and significance not only for the student, but also

for school, city

Criterion 1.4. Analysis of progress, conclusions and perspectives

Points

Analysis replaced brief description progress and order of work

Introduced detailed overview work to achieve the goals stated in

Introduced exhaustive analysis situations that have arisen in the course of work

you, the necessary conclusions have been drawn, the prospects for work have been outlined

Criterion 1.5. Personal interest of the author, creative approach to

Points

work

but did not demonstrate independence in work, did not use the

creative approach

serious interest

changed elements of creativity

Work is different creativity, own original relative

Criterion 1.6. Usefulness and relevance of the product

points

Project product useful after revision, circle of people with which he can

to be in demand implicitly specified

Project product useful, circle of people with which he can be claimed

specified. Named potential consumers and areas of use

product

Product useful. The circle of persons indicated which he will be in demand. Form-

baths actions to promote

2. Formation of subject knowledge and methods of action

Criterion 2.1. Compliance of the chosen methods of work with the goal and content

Points

project

Part methods of work used does not match theme and project goals,

goals may not be fully achieved

Used ways of working correspond topic and purpose of the project, but

lyayutsya inadequate

Ways to work sufficient and used appropriate and efficient, goals

project achieved

Criterion 2.2. Depth of disclosure of the project topic

Points

The theme of the project is revealed fragmentarily

grams

knowledge beyond the curriculum

Criterion 2.3. Design product quality

Points

Project product does not meet most requirements quality (es-

tetics, ease of use, compliance with the stated goals)

Product not completely

Product totally coincides quality requirements (aesthetic, comfortable in

use, corresponds to the stated purposes)

Criterion 2.4. The use of visual aids technical means

Points

Visual aids, incl. TCO, used fragmentarily, not sustained

basic requirements for presentation design

to the design of the presentation, there is no logic in the presentation of the material, there is no agreement

consistency between the presentation and the text of the report

Visual aids, incl. TCO, are used, the basic requirements are met

to the design of the presentation, the presentation of the material is logical, the presentation and the text

report fully agreed

3. Formation of regulatory actions

Criterion 3.1. Compliance with the requirements for the design of the written part

Points

Undertaken attempts to formalize work in accordance with established

rules, give it an appropriate structure

established by the rules

in strict accordance with

established rules

Criterion 3.2. Goal setting, planning ways to achieve it

Points

The goal is formulated, justified, a schematic plan for its achievement is given

The goal is formulated justified, activity planning correlates with

own life experience, tasks are implemented successively

The goal is formulated clearly justified, given detailed plan its achievement

niya, independently carries out control and correction activities

Criterion 3.3. Protection scenario (logic of presentation), competent construction

report

Points

given and received results

to achieve the goals stated in the project

in the course of the work, the necessary conclusions were drawn, prospects were outlined

you work

Criterion 3.4. Compliance with the protection regulations (no more than 5–7 minutes) and

impact on the audience

Points

The material is presented in accordance with the regulations, however, the author failed to interest

poke audience

4. Formation of communicative actions

Criterion 4.1. Clarity and precision, persuasiveness and conciseness

Points

revealed topic during the speech

there is no culture of speech, unmotivated digressions from the stated topic in

there are no

the correctness of speech is observed; accuracy of oral and written speech; clarity of speech, conciseness, unmotivated digressions from the stated topic in the course of

no steps

Criterion 4.2. Ability to answer questions, ability to defend one's point of view

Points

The answers to the questions posed are one-word, uncertain. The author cannot

defend one's point of view

gives his point of view

questions, convincingly and extensively substantiates his point vision

      For the purpose of determining degree of independence student in the course of the project, three levels of development of project activity skills are taken into account. In the case of evaluating the projects of students in grades 5–7, the correspondence between scores and levels is as follows:

    points - low level, 1 point - basic level,

2-3 points - elevated level.

In the case of evaluating the projects of students in grades 8–9, the correspondence between scores and levels is as follows:

    - low level,

    - a basic level of,

    - elevated level.

Read more - Annex to this Regulation.

      Deciding that the project is completed at an advanced level , accepted provided that:

      • such an assessment was made by an expert commission for each of the three criteria that characterize the formation of meta-subject skills (the ability to independently acquire knowledge and solve problems, the formation of regulatory actions and the formation of communicative actions); the formation of subject knowledge and methods of action can be fixed at a basic level;

        none of the mandatory elements of the project (product, explanatory note, manager's feedback or presentation) gives grounds for a different decision. Deciding that the project is completed at the basic level , accepted provided that:

        such an assessment is made by the commission for each of the criteria presented;

        demonstrated All mandatory elements of the project: a completed product that meets the original idea, a list of sources used, a positive review from the manager, a presentation of the project;

        questions were answered.

      In the case of outstanding projects, the expert council may prepare a special opinion on the merits of the project.

Table 3

Control and measuring materials for assessing meta-subject planned results of mastering the basic educational program of basic general education in the form of a final individual project

(levels of development of project activity skills)

Criterion

Level

Base

elevated

The work contains sufficient volume relevant information from sources of the same type

The work contains fairly complete information from a variety of sources

The problem is formulated and justified, a hypothesis (hypotheses) has been put forward, but the action plan for proving / refuting the hypothesis not complete

The problem is formulated justified, put forward a hypothesis (hypotheses), given a detailed plan of action to prove / disprove the hypothesis

The relevance of the project topic and its significance for the student are indicated at the level of statements, grounds are given

The relevance of the project topic and its significance are disclosed and substantiated exhaustively, the topic is relevant and significant to others

Introduced detailed overview work to achieve the goals stated in the project

Introduced exhaustive analysis situations that arise in the course of work, the necessary conclusions are drawn, prospects for work are outlined

Independent acquisition of knowledge and problem solving

Independent work demonstrating serious interest the author, an attempt was made to present a personal view on the topic of the project, applied elements of creativity

The work is characterized by a creative approach, its own original the attitude of the author to the idea of ​​the project

The design product is useful, circle of people by which it can be claimed is indicated. Potential consumers and areas of use of the product are named

Product useful. The circle of persons indicated which he will be in demand. Recommendations on the use of the resulting product were formulated, planned actions to promote it.

Subject Knowledge

Used ways of working correspond theme and goals of the project, but are inadequate

Ways to work sufficient and used relevant and effective, project objectives achieved

Product

Product not completely meets quality requirements

Product totally coincides quality requirements (aesthetic, convenient to use, meets the stated goals)

Visual aids, incl. TCO are used, the basic requirements for the design of the presentation are met, there may be no consistency between the presentation and the text of the report

Visual aids, incl. TCO are used, the basic requirements for the design of the presentation are met, the presentation of the material is logical, the presentation and the text of the report are fully coordinated

Regulatory actions

The written part of the work is framed based on established by the rules order and clear structure, minor errors in the design

The work is clear and well-organized in strict accordance with established rules

The goal is formulated, justified, activity planning is correlated with one's own life experience, tasks are implemented consistently

The goal is formulated clearly justified Dan detailed plan its achievements, independently carries out control and correction activities

Communication

    Documentation

For students

Stages


Activities

Planned execution date

date
actually

Manager's signature

Preparation

Choice of the topic of the educational project and research topics of students;

Development of fundamental question and problematic questions learning topic

Planning

Formulation of problems to be solved;

The choice of means and methods for solving problems;

Determining the sequence and timing of work

Design process

Independent work

Design of notes, posters, etc.

Achieved result

Decor

For project manager

    Individual project implementation plan for each student;

    General information;

Full name of the student

Project theme

Final assessment of the project manager

    Review for each individual project.

The project manager submits the conclusion and review for the work performed by the commission before the defense of the project begins.

For class teacher

    Parent information sheet;

Full name of the student

Project theme

Project Completion Date

Protection date

parents

    The results of the final evaluation of the individual project.

The class teacher, after defending the project, puts the final grade in the class journal.

    Rights and responsibilitiesparties

    1. The individual project leader must:

    together with the student to determine the topic and curriculum of work on an individual educational project;

    together with the student to determine the purpose of the work, stages, deadlines, methods of work, sources necessary information;

    to motivate the student to perform work on an individual educational project;

    assist the student on planning, methodology, formation and presentation of research results;

    control the implementation of the student work plan for the implementation of an individual educational project.

      The head of an individual project has the right to:

    demand from the trainee timely and high-quality performance of work;

    use in their work the information resources available at the school;

    apply to the school administration in case of systematic non-compliance with the deadlines for the implementation of the plan of an individual educational project. student must:

    choose the topic of an individual educational project;

    attend consultations and classes on an individual educational project;

    prepare a public report on the work done.

      In case of non-fulfillment by the head of his duties, he can be replaced by another head by the decision of the pedagogical council, with the consent of the student and his parents.

      The student has the right:

    for a consultation and information support leader at any stage of the implementation of an individual educational project;

    use the resources of the school for the implementation of an individual educational project. comply with the deadlines for the implementation of an individual final project.

      The student is obliged:

    comply with the requirements for the design of the project and its protection;

    submit a written version of the defense of the project to the teacher or supervisor for verification 2 weeks before its defense.

      In case of non-compliance with the requirements of this Regulation, the student is considered not to have achieved the meta-subject planned results of mastering the BEP LLC in accordance with the Procedure for conducting the state final certification for educational programs of basic general education.

    The procedure for the entry into force of a local act

12.1. This Regulation is discussed and adopted by the Pedagogical Council and the Council of the School MBOU "Rylskaya Secondary School No. 4" and approved by the order of the director.

12.2. The regulation is published on the website of the MBOU "Rylskaya secondary school No. 4" and placed on the information stand within 3 days from the date of approval by order.

Annex 1

Sample Application

Director of MBOU "Rylskaya secondary school No. 4"

S.I. Pekhov

student(s) 9 " » cl.

STATEMENT

I ask you to allow the implementation of the final individual project (FIP) in the following direction: ____________________________________________________________________________

Theme SMPS __________________________________________________________________

and secure as the curator of my IIP

_______________________________________________________________ (Name of curator).

«_ » 20 year

student's signature

“I am familiar with the statement, I agree with the chosen direction, the topic”

«_ »_ _20 year

signature of parents / legal representatives

Annex 2

Memo for the student

"Explanatory note to the project"

An introduction that requires:

      name topicproject;

      formulate the project problem that you solved when creating your project, show why it is interesting and important not only for you, but also for others;

      tell what the goal of your project is, what you have achieved as a result of the work, justify that by achieving the goal of the project, you have solved the problem project;

      indicate which project you made product, showconnection between the topic, problem, goal and product of your project;

      give a detailed, detailed work plan for the project, indicating all the main stages and all the smaller steps within each stage, the expected results of each stage, the deadlines for each stage.

In the introduction, it is necessary to highlight the words in bold type: topic, goal, problem, hypothesis (of all projects where it exists), project product, plan.

Main part.

In the main part, you should show what solution to the project problem you found and how you embodied it in the project product, provide a description of the progress of your work on the project, including justifying all the decisions you made and the ideas that you had, all the resources that you used in your project. work.

The materials from which you created the project product; people who helped you, including the guys who took part in your surveys, classroom hours, lessons, etc.; the information you used and where you got it are all resources for your project work.

In addition, in the main part, you can show your point of view on the problem of the project and justify it, referring to your own research, observations, experiments, surveys, analysis of the information you found, opinions of specialists.

Conclusion

In conclusion, you must:

    analyze all your efforts to achieve the goal of the project (what was the most difficult and easiest, what was the most interesting and memorable, what did you learn in the course of working on the project, how did your views change, etc.);

    evaluate the result of your project (what did or didn’t work out for you and why; did you manage to achieve what you planned, when you started your project and why, how would you act to avoid mistakes if

restarted his work).

    show the prospects for possible further work on the problem of your project (what advice would you give to someone who is interested in your work and who wants to continue developing it further, has your own interest in

project problem).

List of used sources of information, where you will present:

    a list of published sources in alphabetical order, indicating the imprint of books and articles;

    addresses of Internet sites with which you worked;

    films, museum exhibitions, etc., if they are sources of information on your project.

Introduction

Sample Plan presentations at the defense of the project

Appendix 3

    Theme of my project……………………………………………………………..……….

    I chose this topic because What…………………………………………….....……….

    The purpose of my work is ……………………………………………………………………

    The project product will be - ……………………………………………………..

    This product will help to achieve the goal of the project, so How……………………

    Plan of my work (indicate the execution time and list all intermediate stages):

    • Gathering information (what and how you were looking for information)…………………………………

      Product manufacturing (what and how did)…………………………………….……..

      Writing the written part of the project did)……………………..…….

Main part

    I started my work by What………………………………

    Then I started To……………………………………………………

    I completed the work with What…………………………………………

    During my work, I came across problems……………………………..

    To deal with problems that arise, I…………………………

    I deviated from the plan (indicate when the schedule was violated work)…………………

    My work plan was disrupted because What……………………………

    In the course of work, I decided to change the project product, so How……………

    But still I managed to achieve the goal of the project, because What…………………

Conclusion

    Having finished my project, I can say that everything that was conceived turned out, For example………………………………………

    It happened because What……………………

    If I started over again, I would……………………………

    Next year I may continue this work in order to to…………

    I think i solved my project problem like this How………………

    Working on the project showed me………………………

Appendix 4

Sample project score sheet.

Sample project score sheet:

(Project name)

Executor: , study ".." class

Project Manager: ,

Criterion

Project Manager

Expert 1

Expert 2

final grade

Formation of cognitive learning activities

Formation of subject knowledge and methods of action

Formation of regulatory actions

Formation of communicative actions

Conclusion:

Date "_ »_ 201… g.

Achieving the basic level (“satisfactory” rating) corresponds to 4 points (one for each criterion).

Achieving an advanced level corresponds to 7-9 points (assessment

"good"), or 10-12 points (rating "excellent").

An educational institution has the right to create its own system for evaluating project activities and describe it in the BEP.

Appendix 5

Stages of work on the project.

Problem

Definition of thematic field and topic

project, search and analysis of the problem, setting the goal of the project, choosing the name of the project

Design (planning)

Discussion options research, comparison of proposed strategies, choice of methods, collection and study of information, determination of the form of the product and product requirements, drawing up a work plan, allocation of responsibilities

Search for information

Execution of planned technological operations, making necessary changes

Product

Preparing and defending a presentation

Presentation reflection

Analysis of the results of the project, assessment of the quality of the project

Portfolio Rating

results

A folder that contains all the working materials of the project, drafts, plans, reports, research and analysis results, diagrams, drawings, photographs, an electronic version of the educational project for presentation

Appendix 6

Approximate action plan for student project activities.

Timing

Responsible

1. Formation of a list of topics for project work.

2. Familiarization with the list of project topics for students and their parents (legal representatives).

1. Teachers - subject teachers 2. Class teacher

Selecting a project topic.

Students and class teachers, subject teachers

Approval of those projects by the director

Classroom teachers

Drawing up an action plan for its implementation, the beginning of the research phase.

Project Managers

The study of literature and media materials on the subject of the project. Definition of work structure.

students

and project managers

Making adjustments to the original intentions and plans, approval

topic wording.

Preparation of electronic materials for the project, completion of the research phase of work.

Students and project managers

Preparation of printed and electronic materials for the project, submission for evaluation to the project manager, preparation of the defense of the project.

Students and project managers

Preparation of project defense. Pre-protection.

Students and project managers

1.Project protection.

2. Evaluation of projects by members of the expert commission

Students and project managers

members of the expert group

1. Registration of the results of the project

activity in the teacher's portfolio. 2. Writing characteristics

students

Classroom teachers

Individual project(FSES p. 11). An individual project is a special form of organizing the activities of students (educational research or educational project). An individual project is carried out by the student independently under the guidance of a teacher (tutor) on a chosen topic within one or more of the studied subjects, courses in any chosen field of activity (cognitive, practical, educational and research, social, artistic and creative, other). The results of the implementation of an individual project should reflect: the formation of skills in communicative, educational and research activities, critical thinking; ability to innovative, analytical, creative, intellectual activity; the formation of project activity skills, as well as the independent application of acquired knowledge and methods of action in solving various problems, using knowledge of one or more academic subjects or subject areas; the ability to set a goal and formulate a research hypothesis, work planning, selection and interpretation of the necessary information, structuring the argumentation of the research results based on the collected data, presentation of the results. An individual project is carried out by a student within one or two years within the study time specially allotted by the curriculum, and must be presented in the form of a completed educational research or a developed project: informational, creative, social, applied, innovative, design, engineering.

Slide 43 from the presentation "Features of the organization of training according to the Federal State Educational Standard of secondary general education in the context of the implementation of SVE programs"

Dimensions: 720 x 540 pixels, format: .jpg. To download a slide for free to use in a lesson, right-click on the image and click "Save Image As...". You can download the entire presentation "Features of the organization of training according to the Federal State Educational Standard of secondary general education in the context of the implementation of SPO programs.ppt" in a 170 KB zip archive.

Download presentation

"FGOS NOO" - Logistics support for the introduction of GEF NOO. On the readiness of educational institutions of the Pavlovsky district for the introduction of the Federal State Educational Standard of the IEO. - Order of the Department of Education dated April 7, 2010 No. 193 "On preparation for the introduction of the Federal State Educational Standard of Primary General Education" - Order of the Department of Education dated October 21, 2010 No. 545 "On the organization of work on the transition to federal state educational standards of general education" - Letter from the Department Education dated February 28, 2011 No. 165 “On monitoring the readiness for the implementation of the Federal State Educational Standard of the IEO”.

"To parents about GEF" - What is distinctive feature new standard? What are the requirements of the new GEF IEO? Parents of future first graders. 2. Teach your child to sit down for lessons on time. 3. Don't force badly done classwork to be redone. What is the Federal State Standard of Primary General Education?

"Educational program of the Federal State Educational Standard" - The ability to carry out the following activities in electronic (digital) form: A set of technological tools that provide. Between members educational process. Organizational support introduction of the Federal State Educational Standard. Olympics competition. Upcoming events. Creation of material objects,

"FSES textbooks" - Educational system "School 2100". Federal State Educational Standard for Basic General Education (2010). The differences relate primarily to the basic curricula. Federal component state standard general education (2004). Textbooks for GEF. Biology.

POSITION

About the student's individual final project according to the Federal State Educational Standard

General provisions

Goals of the final individual project

2.1. Demonstrate to graduates the ability and willingness to master systematic knowledge, their independent implementation, transfer and integration.

2.2. To identify the student's ability to cooperate and communicate.

2.3. To form the graduate's ability to solve personally and socially significant problems and translate the solutions found into practice.

2.4. Assess the graduate's ability and willingness to use ICT for learning and development purposes.

2.5. Determine the level of formation of the graduate's ability of self-organization, self-regulation and reflection.

3. Requirements for the preparation of the final individual project

3.1. A plan, a project preparation program for each student is developed by an educational institution.

3.2. The project manager can be either a teacher of this educational institution or an employee of another organization or other educational institution, including a higher one.



3.3. Students themselves choose both the topic and the project leader.

3.4. The theme of the project must be approved by the educational and methodological association of the school of the corresponding direction.

3.5. The plan for the implementation of the final individual project is developed by the student together with the project leader. The student is guided by the deadlines and recommendations determined jointly with the supervisor. The student has the right to start work on the project starting from the 5th. 6th, etc. class.

3.6. Deadlines for project defense are set at the beginning of the academic year.

Requirements for the content and direction of the project

4.1. Projects created at the school should be devoted to one of the urgent problems of the scientific, cultural, political, legal, social life of the modern world community.

4.2. A project may consider one aspect of a chosen problem, thereby being open, giving other creative teams the opportunity to continue exploring new aspects of this problem.

4.3. Project work includes not only the collection, systematization and generalization of information on the problem raised, but also represents an independent study that demonstrates the author's vision of the problem, its original interpretation or solution.

4.4. The project should have a practical orientation, be in demand and be able to be applied in a particular area of ​​human activity.

4.5. Project assignments should be clearly formulated, goals, objectives and means clearly identified.

4.6. Possible types of work and forms of their presentation:

Table 1

Project type Target Project product
Practice- Solution Analysis data costume,
oriented, practical tasks sociological layout,
social survey, model, musical
atlas, work,
Research Proof or
rebuttal of some attributes multimedia
or hypotheses non-existent product,
states, reports on conducted
Informational Collection of information about
some object business plan, research,
or phenomenon Web site, holiday,
video film, publication,
Creative attraction
interest public To exhibition, guide,
project problem. newspaper, abstract,
magazine, directory,
Gaming or Performance
role-playing experience participation V operating company, system school
decision Problems a game, self-government,
project map, illustration series,
collection, tutorial,
computer Animation, drawing,
office decor, excursion
package of recommendations
poster presentation,
script, article, fairy tale


6. Requirements for design work

6.1. The project work must be presented in printed and electronic form (presentation, website, digital film, etc.).

– Definition of the purpose and objectives of the study.

- Various types of help desk.

(students are required to comply with the rules and regulations of citation).

– An indication of all printed, drawn, graphic, photo, video, musical and electronic materials presented in the project.

– Division into sections or chapters, presented in a logical sequence to more clearly convey the information collected.

6.3. The composition of the materials that must be prepared upon completion of the project to protect it must include:

1) the product of the project activity submitted for defense, presented in one of the forms described above;

2) a brief explanatory note to the project prepared by the student (no more than 10 sheets) indicating for all projects:

a) the original intent, purpose and purpose of the project,

b) a brief description of the progress of the project and the results obtained,

c) a list of sources used. For design projects, the explanatory note also includes a description of the features of design solutions, for social projects - a description of the effects / effect from the implementation of the project;

3) a brief review by the supervisor, containing a brief description of the work of the student during the implementation of the project, including:

a) initiative and independence,

b) responsibility (including the dynamics of attitude to the work performed),

c) performance discipline.

If there are appropriate grounds in the work performed, the review may also note the novelty of the approach and / or the solutions obtained, the relevance and practical significance of the results obtained.

For research projects it is obligatory to have a written report on the study (no more than 10 sheets) and an appendix, including tables, photographs, drawings, diagrams, questionnaires, etc. Mandatory structural parts of a written report are an introduction and a conclusion. The introduction substantiates the relevance of the research topic, defines the goal and objectives, adequate to the subject of study, research methods. In conclusion, the results of the research work are summed up, conclusions are drawn about the accuracy of the working hypothesis.

Written report for creative projects has its own specifics, its structure necessarily describes the author's intention, the stages of product creation, the technologies and materials used. The product of creative activity (product, booklet, video clip, wall newspaper, etc.) must be presented at the defense.

Implementation report social project should contain the following structural components: description of the problem, goals and objectives of the project, alternative solutions, risks of project implementation; analytical description of available and missing resources for project implementation, estimates; the functions of the project participants are indicated in the calendar plan, where the areas of personal participation and areas of responsibility of team members, points of intermediate monitoring are indicated. The planned project product at the end of the project is compared with the result obtained.

6.4. Before being submitted to the expert commission, the disk with the design work must be carefully checked in relation to the technical and demonstration parameters: the launch system, the pace of movement, the strength and purity of the sound. If necessary, the disk should be provided with an explanatory note listing the programs needed to run.

6.5. A general requirement for all works is the need to comply with the rules and regulations of citation, references to various sources. In the case of borrowing the text of the work without indicating references to the source (plagiarism), the project is not allowed to be protected.

Project protection requirements

7.1. Protection is carried out:

1) at a school conference in March, which makes it possible to publicly present the results of work on projects and demonstrate the level of student mastery of individual elements of project activities

2) in the process of specially organized activities of the expert commission of MBOU secondary school No. 162 in April.

The report reflects the purpose and objectives of the project, the main stages of project activities, and the results obtained. Presentation as a presentation / presentation of the results of project work requires communication skills from students, the task that everyone has to solve is to present all the advantages of the project in the most profitable and reasonable way, taking into account the characteristics of the communication space and the audience.

7.2. Regardless of the type of the project, its defense takes place in public: after hearing the report (5–7 minutes), the audience and the jury (expert council) ask questions about the topic of the project. Compliance with the regulations indicates the formation of the regulatory skills of the student. Time protection should be planned in such a way that the student can demonstrate the finished project product or provide materials confirming its implementation.

7.3. A computer presentation is part of the project evaluation as one of the options for the visibility of protection, however, its creation and use should be dictated by the requirements of expediency and efficiency.

Annex 1

Sample Application

Director

MBOU School No. 162 of the city of Samara

Kochkurova E. Ya.

____________________________________­­­­­­­­­­­­­­

student (tsy) 8 "__" class.

STATEMENT

I ask you to allow the implementation of the final individual project (IIP) in the following direction: _________________________________________________

___________________________________________________________________________

IIP topic _________________________________________________________________

______________________________________________________________________________________________________________________________________________________

and fix as the curator of my IIP _____________________________________________________________ (full name of the curator).

"___" _________________ 20__ year ___________________

student's signature

“I am familiar with the statement, I agree with the chosen direction, the topic”

"___" ________________20__ year ___________________

parent's signature /

legal representatives

Annex 2

Memo for the student

"Explanatory note to the project"

An introduction that requires:

name project theme;

formulate the project problem that you solved when creating your project, show how it is interesting and important not only for you, but also for others;

tell what the goal of your project is, what you have achieved as a result of the work, justify that, having achieved the goal of the project, you have solved the problem of the project;

indicate which project you have made product, show the connection between the topic, problem, goal and product of your project;

give a detailed, detailed a project work plan indicating all the main stages and all smaller steps within each stage, the expected results of each stage, the timing of each stage.

In the introduction, it is necessary to highlight the words in bold type: topic, goal, problem, hypothesis (of all projects where it exists), project product, plan.

Main part.

In the main part, you should show what solution to the project problem you found and how you embodied it in the project product, provide a description of the progress of your work on the project, including justifying all the decisions you made and the ideas that you had, all the resources that you used in your project. work.

The materials from which you created the project product; people who helped you, including the guys who took part in your surveys, class hours, lessons, etc.; the information you used and where you got it are all resources for your project work.

In addition, in the main part, you can show your point of view on the problem of the project and justify it, referring to your own research, observations, experiments, surveys, analysis of the information you found, opinions of specialists.

Conclusion

In conclusion, you must:

Analyze all your efforts to achieve the goal of the project (what was the most difficult and easiest, what was the most interesting and memorable, what did you learn in the course of working on the project, how did your views change, etc.);

Assess the result of your project (what did or didn’t work out for you and why; did you manage to achieve what you planned when you started your project and why, how would you act to avoid mistakes if you started your work again) ;

Show the prospects for possible further work on the problem of your project (what advice would you give to someone who is interested in your work and who wants to continue developing it further, has your own interest in the problem of the project been exhausted).

List of used sources of information, where you will present:

List of used in printed sources in alphabetical order, indicating the imprint of books and articles;

Website addresses on the Internet with which you worked;

Films, museum exhibitions, etc., if they are sources of information on your project.

Appendix 3

Approximate presentation plan for the defense of the project

Introduction

The theme of my project……………………………………………………………..……….

I chose this topic because…………………………………………….....……….

The purpose of my work is ………………………………………………………………………

The project product will be – ……………………………………………………..

This product will help achieve the goal of the project, as……………………

Plan of my work (indicate the execution time and list all intermediate stages):

ž Gathering information (what and how I searched for information)……………………………………

ž Manufacturing of the product (what and how was done)……………………………………….……..

ž Writing the written part of the project (as I did)……………………..…….

Main part

I started my work by…………………………………

Then I proceeded to………………………………………………………

I completed the work by……………………………………………

In the course of my work, I encountered the following problems……………………………..

To cope with the problems that have arisen, I …………………………

I deviated from the plan (indicate when the work schedule was violated)…………………

My work plan was disrupted because……………………………

In the course of work, I decided to change the project product, because……………

But still I managed to achieve the goal of the project, because…………………

Conclusion

Having finished my project, I can say that everything that was planned turned out, for example…………………………………………

This happened because……………………

If I started the work again, I would……………………………

Next year, maybe I will continue this work in order to…………

I think I have solved the problem of my project since………………

Working on the project showed me………………………


Appendix 4

Sample project score sheet.

Sample project score sheet:

________________________________________________________________

(Project name)

Performer: ___________________________________, student ___ ".." class

Project Manager: _________________________________,

Conclusion: _____________________________________________________

Date "___" _______________ 201 ...

Appendix 5

Stages of work on the project.

Problem Definition of the thematic field and theme of the project, search and analysis of the problem, setting the goal of the project, choosing the name of the project
Design (planning) Discussing possible research options, comparing proposed strategies, choosing methods, collecting and studying information, determining the form of the product and product requirements, drawing up a work plan, assigning responsibilities
Search for information Execution of planned technological operations, making necessary changes
Product Preparing and defending a presentation
Presentation reflection Analysis of the results of the project, assessment of the quality of the project
Portfolio Evaluation of results A folder that contains all the working materials of the project, drafts, plans, reports, research and analysis results, diagrams, drawings, photographs, an electronic version of the educational project for presentation

Appendix 6

Approximate action plan for student project activities.

Timing Content Responsible
1. Formation of a list of topics for project work. 2. Familiarization with the list of project topics for students and their parents (legal representatives). 1. Teachers - subject teachers 2. Class teacher
Selecting a project topic. Students and class teachers, subject teachers
Approval of those projects by the principal of the school. Classroom teachers
Drawing up an action plan for its implementation, the beginning of the research phase. Project Managers
The study of literature and media materials on the subject of the project. Definition of work structure. Students and project managers
Making adjustments to the original ideas and plans, approving the wording of topics.
Preparation of electronic materials for the project, completion of the research phase of work. Students and project managers
Preparation of printed and electronic materials for the project, submission for evaluation to the project manager, preparation of the defense of the project. Students and project managers
Preparation of project defense. Pre-protection. Students and project managers
1.Project protection. 2. Evaluation of projects by members of the expert commission Students and project managers, members of the expert group
1. Registration of the results of project activities in the Portfolio of the teacher. 2. Writing characteristics Students Class teachers

POSITION

about the student's individual final project according to the Federal State Educational Standard

General provisions

1.1. This provision has been drawn up on the basis of the main educational program of basic general education (FGOS LLC) of MBOU School No. 162.

1.2. An individual final project is the main object of evaluation of meta-subject results obtained by students in the course of mastering interdisciplinary curricula.

1.3. An individual final project is a project carried out by a student within one or more academic subjects.

The purpose of the project: "to demonstrate their achievements in the independent development of the content of selected areas of knowledge and activities, the ability to design and carry out expedient and productive activities (educational, cognitive, design, social, artistic and creative)"

1.4. The implementation of an individual final project is mandatory for each student of the 9th grade studying in the second generation of the Federal State Educational Standard.

1.5. Failure by a graduate (grade 9) of an individual final project to uniformly receive an unsatisfactory grade in any academic subject.

1.6. The defense of an individual final project is one of the mandatory components of the materials for the system of intra-school monitoring of educational achievements.

1.7. The results of the implementation of an individual project can be considered as additional grounds for enrolling a graduate of a basic general school in the chosen direction of specialized education in high school.

A set of methodological materials for the development of an individual educational project at the level of basic general education

Explanatory note

I. Introduction.

A set of assessment materials for assessing the meta-subject planned results of mastering the main educational program of basic general education of the municipal budgetary educational institution "Secondary School No. 125 with in-depth study of mathematics" in the city of Snezhinsk, Chelyabinsk Region in the form of a final individual Russian Federation”(FZ No. 273), the Federal State Educational Standard of Basic General Education, the Model Basic Educational Program of Basic General Education, the Basic Educational Program of Basic General Education of MBOU Secondary School No. 125, the Development Program of MBOU Secondary School No. 125 until 2017 and the School Charter.

When developing the complex, instructive and methodological materials were used for regional monitoring of the assessment of the quality of general education and diagnostic materials developed as part of the implementation of the model of the educational system of the school, providing modern quality education on the basis of state - public administration implementation of the main educational programs of general education.

“Meta-subject planned results are inter-subject concepts mastered by students and universal learning activities (cognitive, regulatory, communicative), the ability to use them in educational, cognitive and social practice, independence of planning and implementation learning activities in organizing educational cooperation with the leader, teachers and peers, building an individual educational trajectory”1.

The achievement of meta-subject results by students is based on teaching general techniques, techniques, schemes, patterns of mental

works that lie above objects, but at the same time are reproduced when working with any subject material.

Project activities and the final individual project allow students, through the conscious and active appropriation of a new social experience"develop key competencies personality, strive for self-development and self-improvement.

Objective assessment of students' activities provides an opportunity for further development their creativity and intellectual potential.

II. The purpose of the complex.

The status of MBOU secondary school No. 125, the features of the educational system of the school, which provides the modern quality of education based on the mechanisms of state and public administration, determine target creation of the complex: development of measuring materials for the final assessment of the meta-subject planned results of mastering the main educational program of basic general education by students in the form of an individual educational project and methodological recommendations for subjects of public administration participating in the assessment process in accordance with the requirements of the Federal State Educational Standard.

III. The structure of the complex.

The set of assessment materials for assessing the meta-subject results of mastering the basic educational program of basic general education consists of the following sections:

Regulations on the project activities of students in the framework of the implementation of the main educational program of the main general

education of the municipal budget general educational

institutions "Secondary school No. 125

with in-depth study of mathematics”;

Evaluation map of the individual final project of the student at the level of basic general education;

Instructional materials for the student and a self-assessment map;

Methodical materials for the project manager;

Applications to the director's orders:

Control plan of the deputy director for academic work for the organization of project work of students in grade 9;

Consultation plan for public experts;

- a list of topics for individual final projects of students and a list of supervisors.

IV. Contents of the complex.

1. Position on the project activities of students in the framework of the implementation of the main educational program of the basic general education of the municipal educational institution "Secondary school No. 125 with in-depth study of mathematics" determines all stages of work on an individual final project, while training in project activity skills is carried out at all levels of general education. In accordance with the requirements of the Federal State Educational Standard of LLC and the main educational program of basic general education MBOU secondary school No. 125, the Regulation contains:

Requirements for the organization of work on an individual final project,

Requirements for the content and focus of individual final projects of students,

Requirements for the design of an individual final project,

Terms and stages of implementation of individual final projects,

Requirements for the defense of an individual final project,

Criteria for evaluating individual final projects.

The Regulations also present ways of presenting the intermediate results of students' project activities: speaking at a school scientific and practical conference, Litvinov's readings, at an open conference of young researchers of ZATO cities.

2. Evaluation map of the individual final project of the student at the level of basic general education

The main object of evaluation of meta-subject results is the formation of cognitive, regulatory and communicative universal educational actions among students. The main procedure for the final assessment is the defense of the individual final project by the students. The criteria for assessing the level of formation of meta-subject planned results of students, developed during the testing of regional monitoring of the quality of general education, have become the main criteria in assessing the individual final project at the basic and advanced levels. The mission of the school with in-depth study of mathematics, the tasks of the main educational program of basic general education, the results of internal monitoring of the quality of general education allow us to present the basic and advanced levels of formation of metasubject results. The assessment card defines the skills and abilities of project activities related to the criteria:

Ability to independently acquire knowledge and solve problems,

Formation of subject knowledge and methods of action,

Formation of regulatory actions,

Formation of communicative actions.

The assessment of the level of formation of meta-subject results at the basic and advanced levels is reflected in the number of points given during the defense of the project by the head of the individual final project and the expert commission. Of particular importance in this case is the development of personally significant skills and abilities of project activities acquired independently (without the help of a leader) in the process of working on a project, as well as an in-depth study of the problem and the practical orientation of the project.

3.Instructive materials for the student and self-assessment map

To work on an individual final project, students are offered the following instructional materials:

Plan form work on an individual final project: the plan is drawn up by the student independently or with the help of the supervisor after approval by the order of the director of the project topic and the appointment of the supervisor and helps to organize work on the project throughout the academic year. Project topics are posted on the school website and on information boards.

Public speaking is a test for a student, so the complex includes memo"How to Prepare a Public Speaking" and evaluation paper, which not only help the student prepare for the defense of the project, but also preliminarily assess their capabilities and make the necessary adjustments.

Requirements for the design of an individual project, a sample project passport and recommendations for computer presentation serve as informative materials and materials for monitoring the presentation of the final product of the project activity, they allow an objective assessment of the formation of the student's ICT competence.

Self-Esteem Map individual project and questionnaire“What was learned during the work on the project was developed in order to form the ability of students to objectively evaluate the product of their own work and timely correct the project. The evaluation criteria were chosen taking into account the student's experience of intermediate certification in the form of defending a project in a lesson. Self-esteem develops critical thinking, the ability to think independently, choose the right ways to solve a problem, and learn new ways of acting.

Questionnaire for students “What did you manage to learn during the work on the project?” allows the student to highlight those project skills and abilities that were obtained in the course of independent work on the project and see the prospect of their development.

Terminological dictionary serves as an assistant in writing and presenting an individual final project.

4. Methodological materials for the project manager :

observation map the progress of the individual final project, which was proposed during the testing of regional monitoring of the quality of general education;

Questionnaire - support- a form of pedagogical reflection, It is offered to the project manager in order to analyze their activities in the course of joint work with the student and is filled out after completion of the work;

Sample Plan individual consultations helps the leader to respond in time to questions that arise during the work on the project, and correct the material already developed by the student on their own;

Review Requirements for an educational project.

The opinion of the project manager, stated in the review, is of great importance for the student and must be taken into account by the experts.

5. Guidance materials and guidelines for public experts.

In the assessment of the meta-subject results of students in the form of an individual final project, public experts who are members of the commission and who are representatives of the public administration bodies of MBOU secondary school No. 125 take part. For them, developed and included in the complex:

guidelines, which include the necessary concepts and reveal the essence of the criteria for assessing the individual final projects of students, as well as the criteria for assessing the levels of formation of skills in project activities. According to guidelines consultations are held with public experts, experts study the Regulations on project activities and participate in the evaluation of projects during the school scientific and practical conference.

As information material for public experts, materials are offered that reveal the meaning of the concept of "skills and skills that are formed in the process of project activities."

6. Control plan Deputy Director for Academic Affairs for the organization of project activities of 9th grade students - part of internal monitoring and is included in the intra-school control plan. The purpose of control is to provide conditions for the successful development of an individual final project of the student and the provision of methodological assistance to the head of the educational project.

V. Conclusions and generalizations.

A set of assessment materials for assessing meta-subject planned results of mastering the basic educational program of basic general education in the form of an individual final project allows you to objectively evaluate different levels the degree of formation of project activity skills among students, as well as the ability to manage their activities, including adjusting and defining new tasks in accordance with a changing situation. The materials of the complex are analytical and educational in nature, because. in the process of assessing the meta-subject planned results of mastering the basic educational program of basic general education and in the process of working on an individual final project “learning itself takes place in the process of activity”.

Such a personal-activity approach to the development of assessment materials provides an opportunity for cooperation between students, managers, and project consultants. The complex provides participation in the evaluation procedures of all subjects of the state-public management of the school. The complex ensures the fulfillment of the requirements of the Federal State Educational Standard of General Education in terms of the system for assessing the meta-subject planned results of mastering the basic educational program of basic general education by students and can be applied in educational organizations of the region that have specialized classes, as well as with minor changes in secondary schools in the region, because the components of the complex as a whole are universal

Position

on the project activities of students in the framework of the implementation of the main educational program of basic general education of the municipal educational institution "Secondary school No. 125 with in-depth study of mathematics"

1. General Provisions

1.1. This Regulation has been developed on the basis of the Law "On Education in the Russian Federation" (No. 273-FZ), the Federal State Educational Standard for Basic General Education, the Exemplary Basic Educational Program for Basic General Education, the Basic Educational Program for Basic General Education, MBOU Secondary School No. 125 and Charter.

1.2. Project activities are understood as purposefully organized activities that bring together teachers, students, parents (legal representatives) and social partners.

1.3. Project work is an activity performed by students within the framework of one or more academic subjects (integrated project), contributes to improving the quality of education, allows you to use the acquired knowledge, master various forms and methods practical work.

1.4. The project activity of students is one of the methods of developmental (personality-oriented) learning, aimed at developing independent research skills (problem posing, collecting and processing information, conducting experiments, analyzing the results), helps develop creative abilities and logical thinking.

1.5. The inclusion of students in project activities is one of the ways to increase the motivation and effectiveness of educational activities at all levels of education, which ensures that students achieve the meta-subject planned results of mastering the main educational program of basic general education.

1.6. All pedagogical structures of the school and public administration bodies of MBOU secondary school No. 125 participate in the organization and provision of the project.

1.7.Project- this is a form of organizing joint activities of a student (students) and a leader (teacher, parents, social partners), aimed at achieving the goal and solving a problem that is significant for the student, designed in the form of a final product.

2. Purpose and objectives of project activities

2.1.Target project activities - creating conditions for cooperation, partnership of participants in the educational process, joint search for new complex knowledge, mastering the ability to use this knowledge when creating their own intellectual product that is in demand by the community; development of creative abilities, logical thinking and social maturation.

2.2.General Tasks:

to strengthen, improve and creatively develop the system of project activities that has developed in the school;

expand the areas of case study in project activities;

to strengthen the prestige of participation in project activities, to cultivate a conscious, responsible attitude to classes in the design and educational field;

expand the boundaries of the practical use of student design work;

involve social partners in project activities and strengthen various mutually beneficial contacts.

2.3.Learning objectives:

to teach planning their own activities;

to form the skill of collecting and processing information, materials, including on the Internet;

develop the ability to analyze (creativity and critical thinking);

to form and develop the ability to write a written report on independent work on an individual final project;

to form a positive attitude to work, an active life position;

to form a system of interdisciplinary integration and a holistic picture of the world.

2.4.Educational tasks:

to educate students' interest in understanding the world, in-depth study of disciplines, revealing the essence of processes and phenomena in all areas of activity;

motivate students to choose a profession, professional and social adaptation;

to form a single school scientific community with its own traditions.

3. Project as a form of final certification of students at the level of basic general education

3.1.Individual final project is an educational project carried out by a 9th grade student within one or more academic subjects in order to demonstrate their achievements in independently mastering the content and methods of selected areas of knowledge and / or activities and the ability to design and carry out expedient and productive activities (educational, cognitive, design , social, artistic and creative).

3.2. An individual final project must be feasible and correspond to the age, abilities and capabilities of the student.

3.3. The topic of an individual final project should be interesting for the student and coincide with the zone of his proximal development.

3.4. An individual final project may include one of the aspects of the chosen problem, thereby being open for its further study.

3.5. An individual final project should have a practical orientation and be in demand, be able to be applied in a particular area of ​​human activity.
3.6. An individual final project is the main object of evaluation of meta-subject results obtained by students in the course of mastering educational programs in academic subjects.
3.7. The implementation of an individual final project is mandatory for each student; failure to complete it is tantamount to receiving an unsatisfactory grade in any academic subject.

3.8. The results of the implementation of an individual final project can be considered as an additional basis for enrolling a 9th grade graduate in their chosen direction of profile education at the level of secondary general education.

4. Requirements for the organization of work on an individual final project

4.1. The general management of the project activities of students in MBOU secondary school No. 125 at the level of basic general education is carried out by the head of the natural and mathematical laboratory and the deputy director for educational work.

4.2. The leaders of the project activities of students are teachers who implement the Federal State Educational Standard of basic general education.

4.3. The leader, consultant of the individual final project of the student may be teachers, parents (legal representatives) of students, employees of other organizations in the profile of the project (social partners).

4.4. The initiator in the selection of the project leader is the student.

4.5. The project manager is appointed by order of the director.

4.6. Project leaders:

Organize the work of the student on an individual final project,

Submit an application for project management of the student, a work plan for consideration by the methodological council of the school;

Seek advice from specialists at the request of students,

Conduct individual consultations with students experiencing difficulties at various stages of work,

Declare the participation of students in competitions at various levels,

4.7. Students independently choose the subject area in which work will be carried out on an individual final project.

4.8. Students, together with the leader, choose a topic, determine the result (product) of the work and its genre features, and plan activities.

4.9. An intermediate examination of the project is carried out by the committee of the methodological council through the analysis of the product of the project activity.

4.10. The deadlines for the defense of individual final projects are approved by the order of the director.

4.11. Public defense of individual final projects is carried out in accordance with the regulations for elective exams.

5. Requirements for the content and focus of individual final projects

5.1. An individual final project can be

monosubject - related to certain areas of knowledge;

meta-subject - related to a certain field of activity;

by dominant activity:

informational (search) is aimed at collecting information about an object, phenomenon, familiarizing project participants with it, its analysis and generalization of facts;

research - subordinate to the logic of a small study, has a structure that coincides with the study;

creative - offers the most free approach to the presentation of the result (performance, script, concert, show, action, etc.);

practice-oriented (applied) - aimed at social interests project participants or customer;

game (role-playing) - the participants in such projects assume certain roles, due to the nature and content of the project.

5.2. Submission of individual final projects can be carried out in the form:

computer presentation describing the product,

demonstration of a device, layout, structure (including LEGO), website or page,

script, excursion, poster reports, photo album, model, essay, collection creative works, video, map, piece of music, game, business game, business plan, etc.;

schemes, algorithms, tables, manuals (including on electronic media), a collection of exercises, workshops,

abstract, including the results of the experiment, experiments, decisions, etc.

6. Requirements for the execution of an individual final project.

6.1 The individual final project must contain:

product of project activity;

project passport with a volume of no more than 4 typewritten pages (A-4 format, Times New Roman font, size 14, spacing - 1, top and bottom margins - 2 cm, right - 3 cm, left - 1.5 cm, justified alignment, indent -1.25), which highlights:

title page showing:

Full name of the educational organization,

Year of its implementation;

an explanatory note stating:

Purpose and objectives of the project;

Short description the progress of its implementation and the results obtained;

List of literature and material and technical resources;

6.2. The individual final project also includes a brief review of the project leader (review).

6.3. Applications (graphs, diagrams, tables, etc.) are placed in a separate block.

6.4. All pages of the individual final project (except for the title page) are numbered.

6.6. Each section starts from a new page, the section heading is placed in the center of the page, the period after the heading is not put.

6.4. Printed material is duplicated on a disk. The cover of a folder - a case for a disk can have elements of a colorful advertising design and contain a brief annotation.

6.5. For participation in competitions of various levels, the supervisor of work organizes the execution of the relevant documentation provided for by the format of the competition.

7. Terms and stages of the implementation of the individual final project

7.1. The terms of preparation and defense of the individual final project are determined by the regulations and approved by the order of the director.

7.2. Project work schedule:

Stage / term

Presentation of the result

Preparatory

(September)

Determination of the topic, purpose and objectives of the individual final project

List of project topics

Planning

(October November)

Formulation of the problem;

Definition of meta-subject planned results;

Identification of information sources, methods of collection and analysis;

Determining how the result will be presented;

Establish procedures and criteria for evaluating results;

Approval of the lists of students and supervisors

Project work plan

Group lists, appointment of leaders

Director's order

Project work

(November-March)

Proposing hypotheses, collecting information, solving intermediate problems;

Selection of tools and their application;

Consulting;

Preparation of the final product

Speech by the leaders of individual final projects of students at the methodological council, at a meeting of the organizing committee of the NOU

intermediate protection. Correction, evaluation of the result (March)

Formulation of conclusions;

Intermediate defense (in the classroom, at the school NPC, at the competition)

competitions, on the Internet

Reflection. Defense of an individual final project at the exam.

(April May)

Project expertise;

Conclusions and offers;

Identification of finds. problems and search for development directions.

Project protection. Determination of the level of formation of meta-subject planned results

8. Summing up the results of work on an individual final project

8.1. To protect individual final projects during the state final certification of 9th grade students in MBOU secondary school No. 125, a special expert commission is being created.

8.2. The composition of the commission is determined by the state and public administration of the school (the pedagogical council, the Governing Council) and approved by the order of the director.

8.3. An individual final project can be presented at the annual school scientific and practical conference, open scientific and practical conferences of various levels.

8.5. If there are outstanding projects, the commission may prepare a special conclusion on the merits of the project with the student's presentation for the Constellation scholarship.

9. Requirements for the defense of an individual final project

9.1. The defense of an individual final project is one of the mandatory components of the materials of the system of intra-school monitoring of the educational achievements of students.

9.2. Students of grade 9 submit their project as an examination paper one week before the defense for review by the commission.

9.3. The project is defended within the time limits set for passing elective exams.

9.4. Students of grade 9 defend their project according to the schedule approved by the director.

9.5. Public defense of an individual final project is carried out orally with a mandatory demonstration of fragments of the project or presentation and should not exceed 10 minutes, the number of slides in the presentation should not exceed 16.

9.6. After the completion of the performance, the student must answer the questions of the commission (if any).

9.7. Public presentation of the individual final project of the student must contain:

substantiation of the chosen topic, evidence of its relevance,

goals and objectives of the project and the degree of their implementation,

a mandatory indication of the degree of independence of the work done,

description of the possibilities of using the product in practice in various fields of activity;

and also takes into account:

emotional impact on listeners

correctness of speech, artistry,

the ability to respond to questions, arguing your answer,

project design.

9.8. All demonstration materials for the defense of an individual final project must be pre-recorded on the computer used during the defense.

9.9. Students are given the opportunity, according to a special schedule, to test the technique and quality of the recording.

10. Criteria for evaluating individual final projects

10.1. The expert commission evaluates the level of formation of the meta-subject planned results of 9th grade students, demonstrated by them during the implementation of the individual final project based on the review of the presented product and the supervisor's review.

10.2. An individual final project is evaluated according to the following criteria:

the ability to independently acquire knowledge and solve problems, manifested in the ability to pose a problem and choose adequate ways to solve it, approbation of the decision made, justification and creation of a model, forecast, layout, object, creative solution;

the formation of subject knowledge and methods of action, manifested in the ability to reveal the content of the work, competently and reasonably, in accordance with the topic under consideration, use the available knowledge and methods of action;

the formation of regulatory actions, which is manifested in the ability to independently plan and manage one's cognitive activity in time, use resource opportunities to achieve goals, and choose constructive strategies in difficult situations;

the formation of communicative actions, manifested in the ability to clearly state and formalize the work performed, present its results, and reasonably answer questions.

10.3. When evaluating an individual final project, 2 levels of development of project activity skills are distinguished: basic and advanced, the main difference between which is the degree of independence of students in the course of project implementation.

10.4. The evaluation of the meta-subject planned results of the student during the defense of the individual final project takes place in accordance with the criteria for evaluating the individual final project by the project manager and members of the expert commission, which are displayed in the evaluation card.

10.5. The final score for each criterion and the final score for the project as a whole is determined by the number of points given by the project manager and members of the expert commission.

CRITERION

LEVELS OF FORMATION OF PROJECT ACTIVITY SKILLS

A basic level of

INCREASED level

1. Independent acquisition of knowledge and problem solving

The work as a whole testifies to the ability to independently, with the help of the manager, pose a problem and find ways to solve it;

Demonstrated ability to acquire new knowledge and/or learn new ways of doing things;

The ability to achieve a deeper understanding of the studied is shown.

The work as a whole testifies to the ability to independently pose a problem and find ways to solve it;

Demonstrated fluency in logical operations, critical thinking skills, the ability to think independently;

The ability, on this basis, to acquire new knowledge and/or master new methods of action, to achieve a deeper understanding of the problem, has been demonstrated.

2. Formation of subject knowledge and methods of action.

Demonstrated understanding of the content of the work performed;

There are no gross errors in the work and answers to questions on the content of the work.

Demonstrated fluency in the subject of project activities;

There are no errors.

3.Regulatory actions

Demonstrated skills in determining the topic and planning work;

The work was completed and presented to the commission;

Some stages were carried out under the supervision and support of the manager;

The ability to analyze and distribute information is shown;

At the same time, individual elements of self-assessment of self-control of the student are manifested.

The work was carefully planned and consistently implemented, all stages of discussion and presentation were completed in a timely manner;

Control and correction were carried out independently.

4. Communicative actions

The skills of designing a project work and an explanatory note, as well as preparing a presentation, were demonstrated;

The topic is clearly defined and explained;

The text is well structured, thoughts are expressed logically and consistently, the arguments are chosen correctly;

The project is of interest from a practical point of view;

10.6. The decision that the individual final project was completed at an advanced level is made on the condition that:

such an assessment is set by the commission for each of the 3 criteria that characterize the formation of meta-subject results, and the formation of subject results can be fixed at a basic level;

none of the mandatory elements of the individual final project gives grounds for a different decision.

10.7. The decision that the individual final project is completed at the basic level is made on the condition that:

such an assessment is made by the commission for each criterion;

all elements of the project are demonstrated;

questions were answered.

10.8. Evaluation of the student's achievement of the meta-subject results of mastering the main educational program of basic general education in the form of an individual final project is recorded in the column "Project activity" or "Exam" in the class journal and the student's personal file. In a state document on the level of education - a certificate of basic general education - is put in a free line.

10.10. If there are outstanding projects, the commission may prepare a special conclusion on the merits of the project with the student's presentation for the Constellation scholarship.

11. Obligations and liability of the parties for violation of established norms

11.1. The leader of the individual final project of the student's work is obliged to:

Ensure constant monitoring of the progress and implementation of the individual final project,

Provide consulting support to the student;

Assist in the design and preparation for the defense of an individual final project;

Provide access to information and other resources available at the school.

11.2. In case of non-fulfillment by the head of his duties, he can be replaced by another head by the decision of the pedagogical council, with the consent of the student and his parents.

11.3. The student is obliged:

comply with the deadlines for the implementation of an individual final project;

comply with the requirements for the design of the project and its protection;

submit a written version of the defense of the project to the teacher or supervisor for verification 2 weeks before its defense.

11.4. In case of non-compliance with the requirements of this Regulation, the student is considered not to have achieved the meta-subject planned results of mastering the BEP LLC in accordance with the Procedure for conducting the state final certification for educational programs of basic general education.

12. The procedure for the entry into force of a local act

12.1. This Regulation is discussed and adopted by the Pedagogical Council and the Governing Council of MBOU Secondary School No. 125 and approved by the order of the director.

12.2. The regulation is published on the website of MBOU secondary school No. 125 and placed on the information stand within 3 days from the date of approval by order.

to a computer presentation of an individual project

(level of basic general education)

The computer presentation of the project work should not exceed 15 slides.

The title page of the presentation includes:

full name of the educational organization;

year of project development

The text of the slides should be informative and contain basic information on all sections of the project, arranged in the order in which each section is presented.

Slides should be titled.

The visibility of a slide can be provided with the help of animation, color effects, illustrations, graphs, diagrams, tables.

Computer presentations are conveniently created using Microsoft programs power point.

ATTENTION! Do not get carried away with excessive inclusion of color and animation effects, because. they divert the attention of listeners from the essence of the project.

2. Evaluation sheet of oral public speaking

FI ______________________________ class ___________

Exercise.

Carefully reread the text of the speech and evaluate it according to these criteria.

Criterion

Indicators

Number of points

For each

Necessary examples and arguments are given

Speech design

Presentation of the text without reading it as written (a plan or theses are possible)

The structure of the speech: introduction, main body, conclusion.

Articulation, lack of errors in speech

Performance Efficiency

Interest in audience performance

Originality and brilliance

Compliance

3. QUESTIONNAIRE

What did you manage to learn while working on the project?

In this questionnaire, mark with a + sign those answers to the question that you did after defending your individual final project on the exam yourself.

Plan your activities, allocate time.

Organize your workspace.

Finish everything to the end.

Obtain information and select the necessary for work.

Highlight the essential.

Get the project right.

Achieve your goals despite mistakes and disappointments.

Listen to different opinions.

Prove your point.

Create a presentation with various effects (animation, drawings, videos, interviews).

Other _______________________________________________

4. Sample plan

individual consultations in the course of work on an individual final project of a student of _________ class

__________________________________________________________

Number of hours

Definition of the topic, list of necessary literature, sources of information.

Drawing up a work plan for the project, defining goals and objectives.

Formulation of the problem and discussion of ways to solve it.

The choice of the necessary tools for working on the project (material and technical resources).

Creation of abstracts for each section of the project and their proof.

Creation of a holistic text of the project (formulation of the final result, product) and its editing.

Formulation of conclusions and generalizations.

Preparing to defend the project. Registration of the passport and folder.

Practice public speaking. Correction

Preparation of a computer presentation of the project.

Training performance with presentation.

5. OBSERVATION MAP

following the progress of an individual project

(for project manager)

Organizational

Check Ö true statement

The theme of the project is determined by the help of the leader

The theme of the project is determined independently, with the help of the head

Check Ö true statement

Transforms a practical task into a cognitive one with the help of a supervisor

Transforms a practical task into a cognitive one with the help of a supervisor

Check Ö true statement

Formulates the problem with the help of the leader

Formulates the problem with the support of the leader

Check Ö true statement

The analysis and search for the problem is carried out with the help of the supervisor.

The analysis and search for the problem were carried out with the support of the manager

Check Ö true statement

The cognitive goal and objectives are formulated with the support of the manager

Independently formulates cognitive goals and objectives

Check Ö true statement

With the help of the manager, he builds a system of questions that ensure the effectiveness of his own activities

Based on the leader or independently builds a system of issues that ensure the effectiveness of their own activities

Check Ö true statement

Works with the text with the direct participation of the head

Works independently with text

Check Ö true statement

Search for information using various sources with the direct assistance of the head

Independently or with the support of a leader, searches for information using various sources

Check Ö true statement

Works on the creation of structured texts directly with the help of the supervisor

Independently or with the support of the leader creates structured texts

Check Ö true statement

Builds an activity algorithm with the help of a leader

Builds an algorithm of activities independently or with the support of a manager

Check Ö true statement

Makes plans, including alternative ones with the help of the manager

Makes plans, including alternative ones independently or with the support of a manager

Check Ö true statement

Plans a learning project with the help of a supervisor

Independently or with the support of the leader plans a training project

Check Ö true statement

Carries out adjustments to its activities with the help of the manager

Carries out adjustments to its activities independently or with the support of a manager

Project Protection

Check Ö true statement

Prepares a training project in accordance with the requirements with the help of a supervisor

Draws up a training project in accordance with the requirements independently or with the support of a supervisor

Check Ö true statement

Presents the educational project in the form of an oral presentation using visual objects with the help of a supervisor. Does not know how to answer questions without the help of a supervisor

Independently presents the educational project in the form of an oral presentation using visual objects. Able to answer questions independently or with the support of a manager

Check Ö true statement

Has difficulty presenting a project, arguing and defending one's position

Able to argue and defend his position when presenting a project

Check Ö true statement

Has difficulty expressing his feelings and thoughts.

Owns monologue and dialogic forms of speech in accordance with the grammatical and syntactic norms of the native language

Check Ö true statement

With the help of the leader, he builds monologue contextual statements

Independently or relying on the leader builds monologue contextual statements

Check Ö true statement

With the help of the manager determines the possibility of using the project

Owns various forms of monologue and dialogical speech for solving socio-cultural problems, a specific definition of the possibilities of using the results of the project

Criteria for evaluating project activities

Check Ö true statement

Carries out preventive control over the result and method of action with the help of a teacher

Independently or with the support of the manager, carries out preventive control on the result and method of action

Check Ö true statement

Carries out self-control and self-assessment of the progress and results of the implementation of the educational project (educational research) with the help of the head

Independently or with the support of the leader, conducts self-control and self-assessment of the progress and results of the implementation of the educational project (educational research).

Check Ö true statement

Evaluates and makes decisions that determine future activities with the help of the manager

Evaluates and makes decisions that determine further activities independently or with the support of a manager

Total score _________________

Increased level (86-100%) - 19 - 22 points

Basic level (63-86%) - 19-15 points

Low level (0-63%) - 0-14 points

Problems that arose during the implementation of the project when observing students:

________________________________________________________________________________________________________________________________________________________

6. REMINDER

for public expert

for evaluating the project work of the student

(level of basic general education, grades 5-9)

Dear member of the expert group! You evaluate an individual project of a student at the level of basic general education. We invite you to study the criteria for evaluating design work adopted in MBOU secondary school No. 125 and take into account very important aspects when scoring a project.

Administrative group

Criterion

The essence of the criterion (what is taken into account)

Social significance of the project

Relevance of the problem solved in the course of project work.

Direction and applicability of the project.

Formulation and ways to solve the problem

The adequacy of the project to the problem posed and how to solve it.

Depth and originality of problem solving

Logical connections, the correctness of research methods, the knowledge of the issue, the choice of a solution to the problem.

Consistency of purpose and result

Degree of problem solving, development of the final product.

Project design

Design, selection of examples, the presence of errors.

Project presentation

Ability to speak clearly, answer questions, defend one's point of view, demonstrate a project.